Planning applications in W1J
We hold 629 planning applications for the W1J postcode area, 222 of them submitted in the past year. 89% of decided applications here were approved. A decision typically takes 54 days. The area is covered by Westminster, Wealden.
Councils covering W1J
Recent applications in W1J
Amendments to planning permission dated 19th August 2026 (RN:26/03808/FULL) for Installation of three replacement air conditioning condenser units at roof level namely, to amend the noise design criteria specified by Condition 4.
Display of non illuminated other sign measuring 2.4m X 2.4m an Art of London initiative from 6th October to 25th October (Piccadilly Circus)
Display of non illuminated other sign measuring 2.4m X 2.4m an Art of London initiative from 6th October to 25th October (outside the May Fair Hotel)
Details of demolition in associated with phase 2 of the development; detailed design and Risk Assessment Method Statement (RAMS) for all demolition works associated with phase 2 of the development; TfL Infrastructure Protection pursuant to condition 28 of planning permission dated 28th October 2024 (RN 23/05723/FULL)
Repair and strengthening work to underside of first floor above passageway.
Repair and strengthening work to underside of first floor above passageway.
Display of an externally illuminated advertising area measuring 7.4m x 10.1m and a 1:1 printed image of the building for a temporary period of 15 months.
Installation of wall mounted highway street light on to the facade of 4 Shepherd Market.
Internal stone cladding to walls, floors, and stair treads; internal redecoration and replacement washbasin; redecoration of existing timber shopfront frame, pilasters, stallriser and fascia surround; removal and refixing of existing non-illuminated flat-cut fascia lettering; and replacement of retractable shopfront canvas awning. (Linked with 26/06069/FULL & 26/06070/ADV)
Display of non-illuminated screen-printed signage to the fabric and valance of retractable canvas awning.
Details of approval of a damp proofing methodology for the vaults with existing and proposed drawings including sections pursuant to condition 19 of listed building consent dated 30th June 2026 (RN 25/06537/LBC)
Display of internally illuminated projecting sign 0.575m X 0.53m, internally illuminated brass logo 1.7m X 0.17m, non illuminated awning 4.45m X 0.57m and 1.7m X 0.57m
Details of additional slab removal for the shower trays and drains on Level 3; pursuant to condition 3 of Listed Building Consent dated 13th March 2026 (25/07529/LBC)
Modification of historic dado wall panelling to facilitate ventilation ducts to the first-floor Grand Dining Room
Replacement of an existing first floor rear window with a pair of French doors within the existing opening; and installation of external air conditioning plant at roof level within an acoustic enclosure, with the adjacent parapet raised.
Refurbishment and enhancement of the existing roof terrace. (Linked with 26/05461/LBC)
Refurbishment and enhancement of the existing roof terrace. (Linked with 26/05460/FULL)
Details of facing materials pursuant to condition 4 of planning permission dated 24 February 2026 (RN: 24/02233/FULL)
Details of facing materials pursuant to condition 5 (partial) of planning permission dated 29 April 2026 (RN: 25/08707/FULL)
Extension of the existing passenger lift to serve the third and fourth floors, including a lift overrun projecting approximately 1,200 mm above roof level with the adjacent parapet raised by approximately 1,200 mm to enclose it.
Details of material samples of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located pursuant to condition 3 of planning permission dated 6th August 2025 (RN:25/03918/LBC)
Erection of canopies and lighting to external facades on Albemarle Street & Piccadilly. (Linked with 26/05355/FULL & 26/05360/ADV)
Samples of the facing materials you will use, including glazing, and elevations and roof plans annotated to show where the materials are to be located; pursuant to condition 3 (partial) of listed building consent dated 29 November 2024 (RN 24/05566/LBC)
External repair and conservation works to existing facades, pitched and flat roofs, dormers and chimneys (linked with 26/05379/LBC)
Erection of canopies and lighting to external facades on Albemarle Street & Piccadilly. (Linked with 26/05356/LBC)
Replacement of the principal staircase; installation of a passenger lift; creation of a new fourth floor within a raised roof structure; formation of a self-contained lower ground floor flat; reconstruction of the lower ground staircase; associated alterations to the front and rear lightwells; internal and external alterations; and associated works. (Linked with 26/05384/LBC)
Replacement of the principal staircase; installation of a passenger lift; creation of a new fourth floor within a raised roof structure; formation of a self-contained lower ground floor flat; reconstruction of the lower ground staircase; associated alterations to the front and rear lightwells; internal and external alterations; and associated works. (Linked with 26/05384/LBC)
Display of two externally illumianted fascia signs each measuring 0.44m x 4.70m; an awning with lettering above side entrance; two menu boards each measuring 0.71m x .45m; two operator plaques measuring 0.28m x 0.44m & 0.44m x 0.440m; and two flags. (Linked with 26/05356/LBC)
External repair and conservation works to existing facades, pitched and flat roofs, dormers and chimneys.
Cleaning, repair, conservation and investigation works to the external stone facades, including masonry repairs, stone indents, repointing, repairs to fractures, treatment of corroded embedded metalwork, stonework investigation works and associated conservation works.
Alterations to doors and windows, installation of new lightweight terrace pavilion, new louvres, replacement of plant and other associated works.
Details of new windows and doors pursuant to condition 3 of planning permission dated 27 Feburary 2024 (RN: 23/03027/FULL)
Erection of operator signage and flags.
Structural works to listed building, including replacement of failed structural beams
Display of 160 warm white LED lights in 16 existing trees in Berkeley Square (10 per tree) for temporary period from 15 November 2026 until 19 January 2027.
Replacement of C20th steel-framed and fibreglass-clad church spire with new structure and traditionally detailed leadwork.
Internal floor finishing works.
Installation of two air conditioning condenser units to the second floor lightwell, two internal air conditioning units, and associated pipework. (Linked with 26/05129/FULL)
Installation of two air conditioning condenser units to the second floor lightwell, two internal air conditioning units, and associated pipework. (Linked with 26/05130/LBC)
Details of facing materials pursuant to condition 5 (partial) of planning permission dated 29 April 2026 (RN: 25/08707/FULL)
Removal of temporary canopy within courtyard and installation of replacement permanent canopy with a retractable glass roof, together with the installation of a new bar, installation of associated plant, creation of entrance to the courtyard via the Long Gallery and other associated works. (Linked to 26/05083/LBC)
Details of additional slab removal for shower trays and drains on Level 4 pursuant to Condition 13 (part) of listed building consent dated 23 February 2026 (RN: 25/07529/LBC).
Demolition of the sixth floor lift room on the west wing of the building, the erection of a two storey extension at roof level to the west wing of the building to provide additional bedrooms to the Lansdowne Club (suis generis), including the extension to existing lift shaft, relocation of plant at roof level, installation of solar panels and other associated internal and external works. (Linked with 26/05080/FULL)
Demolition of the sixth floor lift room on the west wing of the building, the erection of a two storey extension at roof level to the west wing of the building to provide additional bedrooms to the Lansdowne Club (suis generis), including the extension to existing lift shaft, relocation of plant at roof level, installation of solar panels and other associated internal and external works. (Linked with 26/05081/LBC)
Details of completed Appendix A checklist from the Code of Construction Practice pursuant to condition 14 of Planning Permission dated 7th April 2025 (RN:23/05074/FULL.
Use of the fifth floor as retail, cafe, restaurant and ancillary event space, together with the continued operation of the existing mezzanine cafe.
Removal of temporary canopy within courtyard and installation of replacement permanent canopy with a retractable glass roof, together with the installation of a new bar, installation of associated plant, creation of entrance to the courtyard via the Long Gallery and other associated works. (Linked to 26/05082/FULL)
Internal alterations, refurbishment and reconfiguration of the fifth floor; installation of new fixtures, fittings and finishes; refurbishment of windows and glazing; refurbishment of the existing balcony.
Installation of three planters to be placed on the highway outside 18 Shepherd Market.
T1 (Aesculus sp.) - laterally crown reduce by 1.0-1.5m as identified by the red lines shown on T1-SK1 and T1-SK2; and T2 (Pyrus calleryana) laterally crown reduce by 1.5m as identified by the red line shown on T2-SK1. Measured pruning extents to supplement the aforementioned sketches are shown on the 260675-TMA-XX-DR-AP-2300-P00 and 260675-TMA-XX-DR-AP-2400-P00 plans, which show the site in its existing and approved contexts respectively. The pruning to the aforementioned 2no. trees is required, in order to facilitate the installation of a scaffold frame around the existing building at the Site, which is required in order to facilitate the implementation of Full Planning Permission 25/01006/FULL ('the Permission'). In determining the Permission, no arboricultural information was submitted to facilitate its determination; and no conditions require the provision of tree-related information. However, the specified pruning is required to facilitate the implementation of the Permission, hence this Section 211 Notification. For the avoidance of doubt, according to the Delegated Report related to the Permission, the Arboricultural Officers were not a consultee. This Section 211 Notification is therefore submitted to regularise the required pruning to the affected 2no. trees in the only known manner that is feasible relative to the conditional elements of the Permission. The red line planning boundary is shown on all of the plans submitted to this Section 211 Notification; data related to both surveyed trees is also included in the submitted schedule (that uses the BS 5837:2012 methodology).