Skip to content

Solar Panel Planning Applications

19,650 Solar Panel Planning Applications applications on record across the UK

Sample Solar Panel Planning Applications applications

  • HounslowPrior approval for the installation of PV panels on the roof
  • TandridgeNon Material Amendment to planning permission 2016/1855 ( Erection of single storey extension to west elevation, single storey extension to north elevation and new entrance gates to front of property. Amendments to include 1. Relocation of door to the north elevation instead of the window to the new extension. 2. Add a Velux flat roof curved window to the roof. 3. Installation of solar panels on east elevation.
  • CherwellCertificate of Lawfulness of Proposed Development for installation of solar panels on the roof

Most domestic solar panel installations are permitted development and do not require planning permission. However, solar panels on listed buildings, in conservation areas, or that are ground, mounted beyond certain sizes do require consent. Commercial and utility, scale solar farms always require planning permission. Planning Signal tracks all solar planning applications — from domestic prior approvals to large, scale solar farms — across 380+ UK council portals.

What counts as a Solar Panel Planning Applications application

Solar panel installations that require planning permission include:

  • Any solar installation on a listed building
  • Solar panels in a conservation area visible from a public road
  • Ground, mounted solar panels over 9m² on residential properties
  • Commercial solar farms (typically over 1MW or 5ha)
  • Rooftop solar on commercial buildings exceeding permitted development limits
  • Solar carports and canopy structures in most cases

Who tracks Solar Panel Planning Applications applications

Solar installers, renewable energy developers, planning consultants working on renewable energy projects, community energy groups, local councils assessing solar planning policy, and homeowners in conservation areas or with listed buildings all track solar planning applications on Planning Signal.

How Planning Signal helps with Solar Panel Planning Applications applications

Search solar panel planning applications by postcode, monitor specific applications for decision updates, and set free email alerts for new solar applications near you. Planning Signal covers all 380+ UK council planning portals, updated daily.

Frequently asked questions

Do I need planning permission for solar panels?
Most residential solar panels are permitted development and do not need planning permission — if they do not protrude more than 200mm from the roof surface and the installation does not exceed the highest point of the roof. Solar panels on listed buildings or in conservation areas (if visible from a public road) need consent. Ground-mounted solar needs permission if over 9m².
How long does a solar farm planning application take?
Small solar farm applications (below 5MW) are decided by the local planning authority, typically within 8–13 weeks. Larger solar farms (above 50MW) are Nationally Significant Infrastructure Projects decided by the Planning Inspectorate, which takes considerably longer.
How can I track solar panel planning applications near me?
Planning Signal lists all solar panel and solar farm planning applications from UK councils. Search by postcode and set up free email alerts to be notified when new solar applications are submitted in your area.

Trades looking for Solar Panel Planning Applications leads

Planning Signal Leads delivers solar panel planning applications applications directly to tradespeople the moment councils publish them.