Planning applications in PA60
We hold 18 planning applications for the PA60 postcode area, 2 of them submitted in the past year. 85% of decided applications here were approved. A decision typically takes 298 days. The area is covered by Argyll.
Towns and villages in PA60
Councils covering PA60
Recent applications in PA60
Installation of replacement roof covering and reconstruction of derelict byre to form extension to dwellinghouse
Request to discharge conditions relative to application 22/00733/PP. Specifically conditions 2, 3, 4 and 5
Change of use of land for temporary siting of container for commercial purposes (bakery) - retrospective
Certificate of lawfulness (Proposed) for the conversion of unheated storage room into a heated staff welfare room and adjacent store
Alterations and extension to byre (most recently used as storage/studio space) to form dwellinghouse
Demolition of warehouse 2, erection of boiler house for the installation of new pellet boiler, formation of hardstanding area to situate wood pellet handling equipment including silo's, conveyors and ESP's
Siting of accommodation pod for holiday letting purposes
Change of use of agricultural building to form dwellinghouse
Demolition of existing dwellinghouse, erection of replacement dwellinghouse and installation of sewage treatment plant
Removal of roof and section of wall to existing agricultural outbuildings. Erection of dwellinghouse, with adjoining one bedroom guest annexe and 2 one bedroom holiday let cabins and installation of two septic tanks
Erection of two 11kW wind turbines (24.8 metres high to blade tip)
Non Material Amendment to planning permission 14/02652/PP (Erection of wind turbine (24.8 metres to blade tip)) Amend turbine tower type from lattice to tubular to incorporate a tilt design.
Non material amendment to planning permission 14/02652/PP (Erection of wind turbine (24.8 metres to blade tip)) Amend turbine tower type.
Erection of wind turbine (24.8 metres to blade tip)
Erection of an agricultural building
Erection of three 20kW wind turbines (23.2 metres high to blade tip) on a reinforced concrete base
Erection of a 15 metre high wind turbine
Erection of stone cairn featuring interpretation panel