Planning applications in CA19
We hold 32 planning applications for the CA19 postcode area, 22 of them submitted in the past year. 89% of decided applications here were approved. A decision typically takes 66 days. The area is covered by Lake District, Cumbria, Copeland.
Towns and villages in CA19
Councils covering CA19
Recent applications in CA19
Erection of 2 local occupancy dwellings
Proposed stand alone garage
Proposed works involve interventions to the River Mite and Gill Beck to increase the wetting frequency to the floodplain/valley floor and modification/extension of existing ditches
Concreting of yard and building a roof over yard area
DISCHARGE OF CONDITIONS 6, 7, 12, 13 AND THE REQUIREMENTS OF BIODIVERSITY NET GAIN OF PLANNING APPLICATION 4/24/2281/0O1
DEMOLITION OF DUTCH BARN AND ERECTION OF REPLACEMENT AGRICULTURAL BUILDING
Temporary recreational campsite
The proposed replacement transformer is considered to be permitted development under Schedule 2 Part 15 Class B a) (Electricity Undertakings) of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) (the GPDO).
Demolition of the magazine buildings is required as the footprint is identified for use for future site development through the construction of additional low-level waste disposal vaults. The demolition of the concrete magazine buildings will enable the opportunity to re-use the concrete and brick demolition waste on site to be realised.
Construction of wildlife tower.
Approval of details reserved by condition 5 (facing materials) on application 7/2025/4100 - Demolition of existing bungalow and the construction of a new 2 storey family dwelling
The proposed works are to replace the existing oil tank and install air source heat pump, as part of a new renewable heating system.
Fell T30 Sycamore, Fell T28 Ash, Fell T27 Ash, Fell T31 Ash, Fell T41 Beech, Fell T40.2 Ash and Fell T40.3 Ash
The making of a material change of use from a dwellinghouse, falling within Use Class C3 of the Town and Country (Use Classes) Order 1987 (as amended), to short-term holiday letting accommodation.
Replacement greenhouse and shed, replace log stack with wooden log shelter and new shepherd's hut
Construction of a new drainage outfall and headwall, and the enhancement of two existing outfalls with new headwalls.
APPLICATION FOR APPROVAL OF RESERVED MATTERS RELATING TO APPEARANCE, LANDSCAPING, LAYOUT & SCALE PURSUANT TO OUTLINE PLANNING APPROVAL 4/24/2281/0O1
Construction of asphalt hard surfacing and installation of external lighting, covered cycle store, and smoking shelter within existing car park compound, and drainage connection to existing swale.
Demolition of Stores Building
Erection of a barn for the storage of agricultural vehicles, machinery and farm materials
Approval of details reserved by condition 4 (paint colour) of planning permission 7/2025/4068 - Four work packages. a) Internal kitchen floor removal and relaying. b) Removal of flaking paint from window surrounds and porch. c) Removal of interior porch. d) Like for like replacement of windows
Refurbish the bakehouse which forms part of the listed building. It consists of replacement of a rotten oak roof support beam, replacement of two deteriorated oak lintels, one over door and the other over the window and replacement of the fixed window with a bottom hung inward opening hopper opening window
60 day temporary recreational campsite
Extension to dwelling
60 day temporary recreational campsite
Lateral extension to Peel Place Quarry and stopping up and diversion of Public Right of Way 409002
PRIOR NOTIFICATION OF AGRICULTURAL DEVELOPMENT - CREATION OF HANDLING PENS
Erection of conservatory
Oak tree (as photographed and marked Oak in application) - Fell to ground level. 2x Ash trees (as photographed and marked as Ash 1 and Ash 2 in application) - Fell to ground level.
Change of use of the Land from use as agriculture to mixed use as agriculture and for seasonal recreation and leisure accommodation through tented camping and the siting of campervan caravans with associated operational development comprising the installation of a track and areas of hardstanding and erection of buildings
Secondary and emergency access and dog walking area
Seasonal camping