Planning applications in BT52
We hold 20 planning applications for the BT52 postcode area, 2 of them submitted in the past year. 94% of decided applications here were approved. A decision typically takes 140 days. The area is covered by Causeway and Glens.
Towns and villages in BT52
Councils covering BT52
Recent applications in BT52
Partial Discharge of Condition 12 of LA01/2016/0845/RM
Discharge of condition 8 of LA01/2021/1029/F
Single storey timber garden room - ancillary accommodation to the main dwelling for private domestic use.
Retrospective Change Of Use From Residential Dwelling To Short Term Holiday Let. No Changes To Be Made Regarding Current Elevations Or Floor Plans. No Changes In Current Access Or Parking Arrangements.
Proposed two storey rear extension to existing two storey dwelling.
Application to vary Condition No. 2 of Approval LA01/2022/1149/F to allow occupancy of existing building until completion of replacement dwelling and garage on-site.
Discharge of Condition No.3 from LA01/2021/0973/F (Construction Noise Management Plan)
Re use of derelict dwelling and addition of a bedroom at first floor
Replacement Dwelling and Garage
Installation of a new pumping station and 1km underground pipeline to connect to a waste water treatment plant
ERECTION OF A DWELLING WITH GARAGE TOGETHER WITH ACCESS, LANDSCAPING AND ASSOCIATED WORKS.
Repairs to 5 dwellings to include aluminium structural frame and external wall finish. Improvement of thermal insulation to external walling. Improvements to kitchens/bathroom fittings. Replacement of external doors and kitchen windows. External works around the perimeter of each dwelling to support the thermal improvements to the walls.
Proposed extension to existing dwelling and new domestic garage.
Extension to Clamp Storage Area and Provision of New Maintenance Workshop.
A Single 250kw Wind Turbine with a Tower Height of 30m and a Blade Length of 15m (Reduced Dimensions).
Prosposed storey and a half extension to side of existing dwelling
Proposed anaerobic digestion bio-gas facility including storage tanks & silage/maize clamps & associated CHP plant including underground medium pressure gas pipeline and effluent pipes to/from existing creamery
Erection of a 60m high measurment mast, guyed at 50.8m, with 6 No. anemometers, 2 No. wind vanes and 1 No. data logger for a period of 36 months.
Extension to existing semi detached dwelling
Side and rear extension + front porch to existing dwelling