Skip to content

Poulton YMCA Swimming And Fitness Centre Breck Road Poulton-Le-Fylde Lancashire FY6 7HJ

26/00536/LAWPPending Decision
Lawful development certificate

Proposal

Lawful development certificate for proposed photovoltaic equipment to be installed on existing flat roof.

Received
2 September 2026
Public comments
0 · last counted 14 October 2026
Site boundary (council red line)
  1. Received2 Sep
  2. Validated2 Sep
  3. Consult.
  4. Target
  5. Decided

This is a planning application for a solar installation at Poulton YMCA Swimming And Fitness Centre Breck Road Poulton-Le-Fylde Lancashire FY6 7HJ. Wyre has handled 2,075 applications of this type and approves 85% of them, typically deciding them in 58 days. It was submitted on 2 September 2026 and is still awaiting a decision. There have been 5 other applications at this address. We hold 499 applications in total for the FY6 postcode area.

Application Details

Reference
26/00536/LAWP
Address
Poulton YMCA Swimming And Fitness Centre Breck Road Poulton-Le-Fylde Lancashire FY6 7HJ
Postcode
FY6 7HJ
Local Authority
Wyre
Decision Status
Undecided
Current Status
Pending Consideration

Applicant & Agent

Planning Application Dates

Date Received
25 June 2026
Date Validated
2 September 2026
Date Submitted
2 September 2026

Planning Decision

Publicity

Appeal

Additional Information

Documents
10
Coordinates
53.853043, -2.987987
Enriching application data
2/3
Council recordsAppealsFlood risk

Source: Wyre

Track this application

Get email alerts when there is a planning decision or status change.

Get email alerts near FY6

New planning applications delivered to your inbox weekly.

Associated applications

  1. 2026
    2 Sep

    Lawful development certificate for proposed photovoltaic equipment to be installed on existing flat roof.

    This applicationPendingApplication26/00536/LAWP
  2. 2026
    25 Jun

    Lawful development certificate for existing flat roof areas to install photovoltaic equipment.

    PendingCertificate of lawfulness - existingPart of26/00536/LAWE

Planning constraints

Designations that overlap or adjoin the site outline.

  • Green belt: WyreNext to the site
  • Flood zone 1: Low probability (rivers and sea)

Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.

Also checked, none recorded (21)

flood storage areas, conservation areas, listed buildings, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-10-09. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

What's been approved on your street?

See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.

Get The Signal Report