Scott Bader and Company Limited Wollaston Hall High Street Wollaston Wellingborough Northamptonshire NN29 7RJ
Approved on 22 December 2011
Council decision: Application Approved
Proposal
Proposed solar photovoltaic panel system to roof.
- Received
- 9 November 2011
- Council
- Wellingborough
- Ward
- Wollaston
- Agent
- Azur Solar Limited
- ReceivedReceived9 Nov
- ValidatedValidated9 Nov
- Consult.Consultation
- TargetTarget Date4 Jan
- DecidedDecided22 Dec
Decided in 43 days (council typically 56)
About this application
This is a full planning application for a solar installation at Scott Bader and Company Limited Wollaston Hall High Street Wollaston Wellingborough Northamptonshire NN29 7RJ. Wellingborough has handled 750 applications of this type. This one was decided in 43 days, 13 days quicker than Wellingborough's typical decision time. There are no previous applications recorded at this address. We hold 1,135 applications in total for the NN29 postcode area.
94% of full applications at Wellingborough were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- NN29 7RJ
- Application type
- Full Planning Permission
- Scale / size
- Small
- Parish
- Wollaston
Planning application dates
- Date validated
- 9 November 2011
- Consultation start
- 11 November 2011
- Neighbour consultation start
- 11 November 2011
- Target decision date
- 4 January 2012
- Committee meeting
- 8 February 2012
- Decision issued
- 3 January 2012
- Application expires
- 4 January 2012
Applicant and agent
- Agent
- Azur Solar Limited
- Agent address
- 5 The Cuttings Hampstead Norreys Thatcham Berkshire RG18 0RR
Planning decision
- Statutory period
- 56 days
Site constraints
Designations at the address point. Ones next to the site may also apply.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: Wellingborough
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near NN29
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Wollaston Hall High Street Wollaston Wellingborough Northamptonshire NN29 7RJWP/15/00507/FUL · FullApproved0.1 mi
- Wollaston Hall High Street Wollaston Wellingborough NN29 7RJNW/22/00691/LDP · OutlineRefused0.1 mi
- Wollaston Hall High Street Wollaston Wellingborough NN29 7RJNW/22/00835/LDP · OutlineApproved0.1 mi
- Wollaston Hall High Street Wollaston Wellingborough NN29 7RJNW/23/00796/LDP · OutlineApproved0.1 mi
- Scott Bader and Company Limited Wollaston Hall High Street Wollaston Wellingborough Northamptonshire NN29 7RWWP/2010/0395 · OtherApproved0.1 mi
For applicants and trades
Contractors near this project
Find contractors for roofing near this site- MSR Electrical Contractors LtdElectrician0.3 mi
- J.P.R.ElectricalSolar Panel InstallerBattery Storage0.3 mi
- Wollaston WindowsWindow & Door Installer0.4 mi
- C Susans Electrical ContractorsElectrician0.4 mi
Planning something similar?
See what the council approved and refused for solar panel and heat pump installations on your street. Pick your home and get the evidence before you pay for drawings.