Building North Of Pond Farm Duck End Stebbing
Approved on 11 January 2019
Council decision: Prior Approval Not RequiredDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Prior Notification of change of use of from storage or distribution building (Class B8) to Dwellinghouse
- Received
- 15 November 2018
- Decision level
- Delegated (officer decision)
- Council
- Uttlesford District Council
- Ward
- Felsted And Stebbing
- ReceivedReceived15 Nov
- ValidatedValidated16 Nov
- Consult.Consultation11 Dec
- TargetTarget Date11 Jan
- DecidedDecided11 Jan
Decided in 56 days (council typically 49)
About this application
This is an outline application for a change of use at Building North Of Pond Farm Duck End Stebbing. Uttlesford has handled 476 applications of this type. This one was decided in 57 days, 8 days longer than Uttlesford's typical decision time. The site is in 3 listed buildings nearby. There have been 2 other applications at this address. In the past year there have been 101 applications across Felsted And Stebbing.
72% of outline applications at Uttlesford District Council were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Prior Approval Part 3 Class P
- Scale / size
- Small
- Parish
- Stebbing
Planning application dates
- Date validated
- 16 November 2018
- Consultation expiry
- 28 December 2018
- Consultation start
- 20 November 2018
- Consultation end
- 11 December 2018
- Neighbour consultation start
- 20 November 2018
- Neighbour consultation end
- 11 December 2018
- Last date for comments
- 28 December 2018
- Target decision date
- 11 January 2019
- Permission expires
- 11 January 2024
Planning decision
- Statutory period
- 56 days
Publicity
- Site notice start
- 7 December 2018
- Site notice end
- 28 December 2018
Additional information
- Documents
- 20
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (24)
flood storage areas, conservation areas, listed buildings, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
4 other applications at this property, newest first.
- 20242 Aug
Agricultural Barn
PendingAgricultural DeterminationUTT/24/1973/AG - 20209 Mar
Alteration to and the conversion of a B8 storage building to a C3 dwelling house.
ApprovedFully DetailedUTT/20/0594/FUL - 20188 Aug
Prior Notification of change of use of from storage or distribution building (Class B8) to Dwellinghouse
RefusedPrior Approval Part 3 Class PUTT/18/2228/PAP3P - 20057 Feb
Change of use of redundant farm building to B8 General Storage and access road
WithdrawnFully DetailedUTT/0192/05/FUL
Source: Uttlesford
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- Pond Farm Duck End Stebbing CM6 3BSUTT/0192/05/FUL · FullWithdrawn0.0 mi
- Building North Of Pond Farm Duck End StebbingUTT/18/2228/PAP3P · OutlineRefused0.0 mi
- Duck End Barn Dunmow Road From Lindsell To Duck End Duck End Stebbing Essex CM6 3BSUTT/24/1973/AG · OtherAwaiting decision0.0 mi
- Poplar Farm Dunmow Road From Lindsell To Duck End Duck End Stebbing Essex CM6 3BSUTT/22/1642/DOC · ConditionsApproved0.0 mi
- Poplar Farm Duck End Stebbing Dunmow CM6 3BSUTT/22/0367/FUL · FullApproved0.0 mi
For applicants and trades
Contractors near this project
- TN ElectricalBuilding controlsCommercial & industrial electrical installations1.5 mi
- G S Craft LtdElectrician1.6 mi
- Loughton Mechanical and Electrical Contractors LtdElectrician2.2 mi
- Bardfield Garden CentreLandscapers2.5 mi
Planning something similar?
See what the council approved and refused for changes of use on your street. Pick your home and get the evidence before you pay for drawings.