Skip to content

Tower Bridge, Tower Bridge Approach, London, SE1

PA/26/00992/NCApproved

Approved on 4 August 2026

Council decision: Permit

Proposal

Installation of a fall protection system to the high level walkway gantries to Tower Bridge.

Submitted
9 June 2026
Ward
St Katharines and Wapping
  1. Received9 Jun
  2. Validated9 Jun
  3. Consult.
  4. Target
  5. Decided4 Aug

Decided in 56 days

About this application

This is a planning application at Tower Bridge, Tower Bridge Approach, London, SE1. Tower Hamlets has handled 11,273 applications of this type. This one was decided in 56 days. The site is in the The Tower conservation area, with 2 listed buildings nearby. There are no previous applications recorded at this address. In the past year there have been 126 applications across St Katharines and Wapping.

Application details

Planning application dates

Date validated
9 June 2026

Applicant and agent

Applicant
Private applicant

Planning decision

Case officer
Emma Klein

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations at the address point. Ones next to the site may also apply.

  • Flood zone 3: High probability (rivers and sea)
  • Conservation area: The Tower
Also checked, none recorded (23)

flood storage areas, listed buildings, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Planning history at this site

14 other applications at this property, newest first.

  1. 2026
    27 Mar

    Proposed installation of a floating barge at Tower Bridge Quay to facilitate the charging and operation of a…

    ApprovedFull Planning PermissionPA/26/00565/NC
  2. 2025
    3 Nov

    Additional restoration works associated with the 'Mud Tanks' project, aimed at improving the longevity and…

    ApprovedListed building consentPA/25/01922/NC
  3. 2025
    22 Jul

    Removal of the existing sprinkler system within the North Tower of Tower Bridge while installing a new fire…

    ApprovedAll OtherPA/25/01308/NC
  4. 2025
    22 Jul

    Listed Building Consent for the removal of the existing sprinkler system within the North Tower of Tower…

    ApprovedListed building consentPA/25/01309/NC
  5. 2025
    15 Jul

    Maintenance works to the six 'mud tanks' of Tower Bridge, to repair and re-line the tanks, as well as to…

    ApprovedListed building consentPA/25/01174/NC
  6. 2025
    6 May

    Application for certificate of Lawfulness in respect of proposed replacement of hydraulic motors.

    ApprovedLawful development: Proposed usePA/25/00784/NC

Source: Tower Hamlets

Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.