Skip to content

Orchard Wharf, Orchard Place, London E14

PA/24/00233/NCAwaiting decision
Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Request for an Environmental Impact Assessment (EIA) Scoping Opinion under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended), in respect of the comprehensive re-development of the site requiring the demolition of all existing buildings and structure and construction of the mixed-use development with the following elements: Excavation and construction of a new two-level basement structure; Construct of a three-storey concrete box (to accommodate the reactivated safeguarded wharf facility) up to 16m AOD with approximately 8,200sqm GIA of operational floorspace (Use Classes B2/B8) plus ancillary office accommodation; Construction of a new pontoon structure for vessel docking and loading/unloading for the safeguarded wharf facility operations, including works to the river wall and works within and adjacent to the River Thames; Construction of seven buildings, six of which would be at podium level (Plots 2, 3, 4, 5, 6 and 7) above the concrete box and one at ground level to the north of the box (Plot 1), extending up to approximately 30 storeys and ranging in height from approximately 32m AOD to 88.5m AOD; Up to 1,365 Purpose Built Student Accommodation beds (Sui Generis); Up to 230 residential units (Use Class C3) Up to approximately 400sqm GIA of flexible commercial spaces (Use Class E); Blue badge car parking, and cycle parking; Improvements and possible extension to the Thames Path; and Access arrangements, associated open space and landscaping.

Submitted
12 February 2024
Ward
Blackwall and Cubitt Town
  1. Received12 Feb
  2. Validated12 Feb
  3. Consult.
  4. Target
  5. Decided

About this application

This is a planning application for demolition at Orchard Wharf, Orchard Place, London E14. Tower Hamlets has handled 7,432 applications of this type. It has been with the council since 12 February 2024 and is still awaiting a decision. There has been 1 other application at this address. In the past year there have been 110 applications across Blackwall and Cubitt Town.

Application details

Planning application dates

Date validated
12 February 2024
Decision issued
21 March 2024

Applicant and agent

Applicant
Private applicant

Planning decision

Decision
Scoping Opinion Issued
Case officer
Aleksandra Milentijevic

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Flood zone 3: High probability (rivers and sea)Part of the site
  • Brownfield land register: Hercules Wharf, Castle Wharf and Union Wharf Orchard PlaceRegister site at or near this address
Also checked, none recorded (23)

flood storage areas, conservation areas, listed buildings, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves and heritage coasts.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Tower Hamlets

Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

What's been approved on your street?

See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.

Get The Signal Report