Skip to content

38 To 40, Trinity Square, London

PA/11/00163/B1Full Planning PermissionRefused
Full

Refused on 8 March 2012

Council decision: RefusePlanning committee

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Erection of a 9-storey building with basement, comprising a 370-room hotel (Use Class C1) with associated ancillary hotel facilities including cafe (Use Class A3), bar (Use Class A4) and meeting rooms (Use Class B1) with plant and storage at basement and roof level. The application also proposes the formation of a pedestrian walkway alongside the section of Roman Wall to the east of the site; the creation of a lift overrun to facilitate a lift shaft from ticket hall level to platform level within the adjacent London Underground station and associated step free access works; works of hard and soft landscaping;and other works incidental to the application.

Received
28 January 2011
Decision level
Planning committee
Ward
St Katharines and Wapping
  1. Received28 Jan
  2. Validated28 Jan
  3. Consult.4 Mar
  4. Target9 Jun
  5. Decided8 Mar

Decided in 405 days (council typically 56)

About this application

This is a full planning application at 38 To 40, Trinity Square, London. Tower Hamlets has handled 1,261 applications of this type. This one was decided in 405 days, 50 weeks longer than Tower Hamlets's typical decision time. The site is in the The Tower conservation area, with 8 listed buildings nearby. There are no previous applications recorded at this address. In the past year there have been 125 applications across St Katharines and Wapping.

83% of full applications at London Borough of Tower Hamlets were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Full Planning Permission
Scale / size
Large

Planning application dates

Date validated
28 January 2011
Consultation expiry
15 August 2011
Consultation start
11 February 2011
Consultation end
4 March 2011
Neighbour consultation start
11 February 2011
Target decision date
9 June 2011
Committee meeting
1 March 2012

Applicant and agent

Agent
DP9
Agent address
100 Pall Mall, London, SW1Y 5NQ

Planning decision

Statutory period
132 days

Publicity

Last advertised
15 August 2011
Site notice start
11 February 2011

Appeal

Appeal result
Allowed

Additional information

Comments
0
Documents
293

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

Also checked, none recorded (22)

flood storage areas, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Tower Hamlets

Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.