Bordyke Cottage, Bordyke, Tonbridge, TN9 1NN
Approved on 15 January 2026
Delegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Demolition of existing rear extension. Erection of a single storey side and rear extension
- Received
- 3 September 2025
- Decision level
- Delegated (officer decision)
- Ward
- Cage Green And Angel
- ReceivedReceived3 Sep
- ValidatedValidated3 Sep
- Consult.Consultation2 Oct
- TargetTarget Date29 Oct
- DecidedDecided15 Jan
Decided in 134 days (council typically 63)
About this application
This is a full planning application for demolition at BORDYKE COTTAGE, BORDYKE, TONBRIDGE, TN9 1NN. Tonbridge has handled 2,266 applications of this type. This one was decided in 134 days, 10 weeks longer than Tonbridge's typical decision time. The site is in the Tonbridge conservation area, with 8 listed buildings nearby. There are no previous applications recorded at this address. In the past year there have been 118 applications across Cage Green And Angel. We hold 641 applications in total for the TN9 postcode area.
93% of full applications at Tonbridge and Malling Borough Council were approved. Across all application types, the council typically decides in about 9 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- TN9 1NN
- Application type
- Householder planning permission
- Scale / size
- Small
- Parish
- Tonbridge
Planning application dates
- Date validated
- 3 September 2025
- Consultation expiry
- 2 October 2025
- Consultation end
- 2 October 2025
- Target decision date
- 29 October 2025
- Application expires
- 27 September 2025
- Permission expires
- 14 January 2029
Planning decision
- Statutory period
- 56 days
Publicity
- First advertised
- 11 September 2025
- Site notice start
- 11 September 2025
Additional information
- Planning Portal ID
- PP-14300590
- UPRN
- 100061167495
- Documents
- 15
Site constraints
Designations that overlap or adjoin the site outline.
- Conservation area: Tonbridge
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions. Ask the council if these matter.
Possibly incomplete for this council: tree preservation orders.
Also checked, none recorded (20)
flood storage areas, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Associated applications
- 20253 Sep
Demolition of existing rear extension. Erection of a single storey side and rear extension
ApprovedHouseholderPart of25/01446/HH - 20253 Sep
Demolition of existing rear extension. Erection of a single storey side and rear extension
This applicationApprovedFull25/01446/PA
Planning history at this site
1 other application at this property, newest first.
Source: Tonbridge
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near TN9
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Bordyke Cottage Bordyke Tonbridge Kent TN9 1NN26/01188/NMA · AmendmentApproved0.0 mi
- 14A, BORDYKE, TONBRIDGE, TN9 1NN24/01216/PA · OutlineApproved0.0 mi
- WALMER HOUSE, 13, BORDYKE, TONBRIDGE, TN9 1NN24/01116/PA · FullApproved0.0 mi
- WALMER HOUSE, 13, BORDYKE, TONBRIDGE, TN9 1NN24/01118/PA · HeritageApproved0.0 mi
- 19 Bordyke Tonbridge Kent24/01881/TPOC · TreesRefused0.0 mi
For applicants and trades
Contractors near this project
Find contractors for extensions near this site- S N ElectricalElectrician0.2 mi
- Southern Asbestos Services Ltd0.4 mi
- J P Glass LtdWindow & Door Installer0.5 mi
- Coppendale JoineryWindow & Door Installer0.5 mi
Planning something similar?
See what the council approved and refused for wrap-around (side and rear) extensions on your street. Pick your home and get the evidence before you pay for drawings.