Holiday Inn Redbridge Lane Nursling Southampton Hampshire SO16 0YP
Approved on 23 July 2026
Council decision: Prior Approval Required and Granted1 condition
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Application to determine if prior approval is required for a proposed installation of photovoltaic (PV) solar panels to the roof of a non-domestic building
- Received
- 26 May 2026
- Council
- Test Valley Borough Council
- Ward
- CHILWORTH, NURSLING & ROWNHAMS
- ReceivedReceived26 May
- ValidatedValidated27 May
- Consult.Consultation17 Jun
- TargetTarget Date22 Jul
- DecidedDecided23 Jul
Decided in 57 days
About this application
This is a planning application for a solar installation at Holiday Inn Redbridge Lane Nursling Southampton Hampshire SO16 0YP. Test Valley has handled 8,853 applications of this type. This one was decided in 58 days, 9 days longer than Test Valley's typical decision time. There are no previous applications recorded at this address. In the past year there have been 141 applications across CHILWORTH, NURSLING & ROWNHAMS. We hold 476 applications in total for the SO16 postcode area.
Application details
- Postcode
- SO16 0YP
- Application type
- RENEWABLE ENERGY CLASS J - SOUTH
- Scale / size
- Small
- Parish
- NURSLING AND ROWNHAMS
Planning application dates
- Date validated
- 27 May 2026
- Consultation expiry
- 17 June 2026
- Consultation start
- 27 May 2026
- Consultation end
- 17 June 2026
- Last date for comments
- 18 June 2026
- Target decision date
- 22 July 2026
Applicant and agent
- Agent
- Hollis
- Agent address
- 138 Cheapside Third Floor London EC2V 6BJ
Atlas Hotels Limited
Company number 03218948
- Status
- Active
- Type
- Private limited company
- Incorporated
- 1 Jul 1996 (30 years old)
- Nature of business
- Hotels and similar accommodation
- Registered office
- Leicester
1 other planning application by this company in Bedford.
- 26/01682/SPNJ · Bedford · Express By Holiday Inn Wilstead Road Elstow Bedford Bedfordshire MK42 9BB
Company information from Companies House.
Planning decision
- Statutory period
- 56 days
Additional information
- Planning Portal ID
- PP-14962879
- Documents
- 11
Site constraints
Designations that overlap or adjoin the site outline.
- Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Wat…Applies to new homes and overnight accommodation
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions. Ask the council if these matter.
Possibly incomplete for this council: tree preservation orders.
Also checked, none recorded (20)
flood storage areas, conservation areas, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: Test Valley
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near SO16
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- The Padel Hub Units A1 And A2 Adanac Trade Park Adanac Drive Nursling Southampton Hampshire SO16 0AU26/00474/ADVS · AdvertisingApproved0.1 mi
- Adanac Health And Innovation Campus Hurst Way Nursling Hampshire26/00701/FULLS · FullApproved0.2 mi
- Bargain Farm Frogmore Lane Nursling Southampton Hampshire SO16 0XS23/03079/ADVS · AdvertisingApproved0.3 mi
- 61 Hillyfields Nursling Southampton Hampshire SO16 0XP25/02284/FULLS · FullApproved0.3 mi
- Yeoman Industrial Park Test Lane Nursling Southampton Hampshire SO16 9JX24/01827/TPOS · TreesApproved0.4 mi
For applicants and trades
For the applicant
Need an energy or sustainability statement? Energy & sustainability consultants near this site
Condition 01 on the decision asks for this.
Consultants on this application
- Hollis · Agent for this application
- 8.1 miWinchesterRTPI
- 11.2 miWinchesterRTPI
- 11.9 miFarehamRTPIRICS Regulated
Nearest first, within 25 miles of the site. Every firm is listed free.
Contractors near this project
Find contractors for roofing near this site- Recharge Renewables LtdElectrician0.2 mi
- Wired Services LtdElectrician0.3 mi
- Intersafe LtdElectrician0.7 mi
- Vear M & E Services LtdElectrician0.7 mi
What's been approved on your street?
See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.
Get The Signal Report