Belmont House, Belmont Road, Ironbridge, Telford, Shropshire TF8 7QT

TWC/2026/0713Listed BuildingAwaiting decision
Listed building consent
Approximate location: the centre of the postcode, not the exact property.

Proposal

Repointing of external walls with lime mortar, repair and replacement of roof coverings roof to match existing, installation of 3no. roof lights, replacement of rainwater goods and soil vent pipe, replacement of front entrance door, and internal alterations to include reconfiguration of a doorway, bathroom refurbishment, repairs to internal walls and ceilings, and replacement of existing fire surround (Listed Building Application)

Received
18 September 2026
Ward
Ironbridge Gorge
  1. Received18 Sep
  2. Validated2 Oct
  3. Consult.28 Oct
  4. Target
  5. Decided

Have your say

Comments close on 28 October.

About this application

This is a planning application at Belmont House, Belmont Road, Ironbridge, Telford, Shropshire TF8 7QT. Telford has handled 15 applications of this type. It has been with the council since 2 October 2026 and is still awaiting a decision. The site is in the Severn Gorge conservation area, with 3 listed buildings nearby. There has been 1 other application at this address. In the past year there have been 74 applications across Ironbridge Gorge. We hold 1,766 applications in total for the TF8 postcode area.

93% of all applications at Telford and Wrekin Council were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Postcode
TF8 7QT
Application type
Listed Building
Parish
The Gorge

Planning application dates

Date validated
2 October 2026
Consultation end
28 October 2026

Applicant and agent

Applicant
Private applicant
Agent address
Station Lane Hollybush Road Bridgnorth Shropshire WV16 5DP,

Planning decision

Case officer
Caitlin Harper

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations at the address point. Ones next to the site may also apply.

  • Conservation area: Severn Gorge
  • World Heritage Site: Ironbridge Gorge
  • Flood zone 1: Low probability (rivers and sea)

Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.

Also checked, none recorded (20)

flood storage areas, listed buildings, green belt, scheduled monuments, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Associated applications

  1. 2026
    2 Oct

    Repointing of external walls with lime mortar, repair and replacement of roof coverings roof to match…

    This applicationPendingListed building consentTWC/2026/0713
  2. 2026
    2 Oct

    Repointing of external walls with lime mortar, repair and replacement of roof coverings roof to match…

    PendingFull PlanningFiled alongsideTWC/2026/0714

Planning history at this site

14 other applications at this property, newest first.

  1. 2026
    25 May

    Overall reduction by up to 1m and removal of lower branch that overhangs the path to 1no. Mulberry tree (T1)…

    ApprovedTrees in Conservation AreaTWC/2026/0367
  2. 2024
    28 May

    Removal of Condition 4 (EPS Mitigation Licence) of previously approved TWC/2023/0104

    ApprovedVariation of conditions (s73)TWC/2024/0417
  3. 2023
    1 Feb

    Retention of decking with glazed panels (Full Planning Application) (Retrospective) *** AMENDED DESCRIPTION…

    ApprovedFull PlanningTWC/2023/0182
  4. 2023
    31 Jan

    Creation of new access from first floor main bedroom into the second bedroom which will then be split into an…

    ApprovedListed building consentTWC/2023/0105
  5. 2023
    31 Jan

    Internal layout changes to first and second floor and the addition of roof lights (Listed Building…

    PendingListed building consentTA/2023/0143
  6. 2023
    31 Jan

    Internal layout changes to first and second floor and the addition of roof lights (Full Planning Application)

    PendingFull PlanningTA/2023/0142

Source: Telford

Track this application

Get email alerts when there is a planning decision or status change.

Get email alerts near TF8

New planning applications delivered to your inbox daily.

Around this site

For applicants and trades

Before the decision

You may need a heritage statement. Heritage & archaeology consultants near this site

This is an application for listed building consent.

Nearest first, within 50 miles of the site. Every firm is listed free.

Planning something similar?

See what the council approved and refused for window and door replacements on your street. Pick your home and get the evidence before you pay for drawings.