Skip to content

Ingleside, Barnett Leasowes, Ironbridge Road, Ironbridge, Telford, Shropshire, TF8 7NB

TWC/2018/0176Full PlanningApproved
Full

Approved on 30 May 2018

Council decision: Full GrantedDelegated (officer decision)

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Replacement of windows and door on front elevation of property ****AMENDED DESCRIPTION TO OMIT WORKS TO DORMER****

Received
13 February 2018
Decision level
Delegated (officer decision)
Ward
Ironbridge Gorge
Agent
C-Thru Shropshire LTD,
  1. Received13 Feb
  2. Validated27 Feb
  3. Consult.20 Mar
  4. Target
  5. Decided30 May

Decided in 92 days (council typically 56)

About this application

This is a full planning application for a dormer extension at Ingleside, Barnett Leasowes, Ironbridge Road, Ironbridge, Telford, Shropshire, TF8 7NB. Telford has handled 2,376 applications of this type. This one was decided in 106 days, 7 weeks longer than Telford's typical decision time. The site is in the Severn Gorge conservation area. There has been 1 other application at this address. In the past year there have been 74 applications across Ironbridge Gorge. We hold 1,766 applications in total for the TF8 postcode area.

92% of full applications at Telford and Wrekin Council were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Postcode
TF8 7NB
Application type
Full Planning
Scale / size
Small
Parish
The Gorge

Planning application dates

Date validated
27 February 2018
Consultation expiry
27 March 2018
Consultation end
20 March 2018
Application expires
24 April 2018

Applicant and agent

Applicant
Private applicant
Agent
C-Thru Shropshire LTD,
Agent address
4C Gower Street St. Georges Telford Shropshire TF2 9HW,

Planning decision

Statutory period
56 days

Publicity

Last advertised
22 March 2018
Site notice end
27 March 2018

Additional information

Documents
24

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Conservation area: Severn Gorge
  • World Heritage Site: Ironbridge Gorge
  • Flood zone 1: Low probability (rivers and sea)

Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.

Also checked, none recorded (20)

flood storage areas, listed buildings, green belt, scheduled monuments, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Associated applications

  1. 2018
    13 Feb

    Replacement of front windows and door and the installation of cladding to existing dormer

    PendingFull PlanningFiled alongsideTA/2018/0278
  2. 2018
    13 Feb

    Replacement of windows and door on front elevation of property ****AMENDED DESCRIPTION TO OMIT WORKS TO…

    This applicationApprovedFullTWC/2018/0176

Source: Telford

Track this application

Get email alerts when there is a planning decision or status change.

Get email alerts near TF8

New planning applications delivered to your inbox daily.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused for loft conversions and dormers on your street. Pick your home and get the evidence before you pay for drawings.