Skip to content

102 Moorside Street Droylsden Tameside M43 7HL

25/01053/FULRefused

Refused on 9 March 2026

Council decision: Refuse5 reasons for refusal

Site boundary (council red line)

Proposal

Change of use of the existing 3-bedroom dwelling house (Use Class C3) to a 6-bedroom HMO (Use Class C4) and single storey rear extension and loft conversion with rear dormer

Received
23 December 2025
  1. Received23 Dec
  2. Validated13 Jan
  3. Consult.
  4. Target
  5. Decided9 Mar

Decided in 55 days

About this application

This is a planning application for a single storey rear extension at 102 Moorside Street Droylsden Tameside M43 7HL. Tameside has handled 5,470 applications of this type. This one was decided in 55 days, 6 days longer than Tameside's typical decision time. The site is in a conservation area. There have been 3 other applications at this address. We hold 861 applications in total for the M43 postcode area.

Why it was refused

  1. It is not considered that the building is suited to residential development in a manner that can achieve an acceptable design. The building represents a significant intensification of use which would comprise of overdevelopment of the site. Contrary to policies C1: Townscape and Urban Form, H10: Detailed Design of Housing Developments of the adopted Tameside Unitary Development Plan and Policy RD3: Efficient use of Land of the Tameside Residential Design Supplementary Planning Document and the National Planning Policy Framework.
  2. The building does not lend itself to residential accommodation on a scale which is proposed. By reason of the communal space available, the proposed kitchen and dining facilities are considered inadequate to cater for the needs of up to six occupants. Additionally, the accommodation proposed fails to meet the needs of potential occupiers, failing to accord with the THS for internal floorspace, creating a poor standard and poor quality of amenity for future residents. The proposal would conflict with Policy H10 of the Tameside Unitary Development Plan, Policies RD11, RD12 and RD18 of the Tameside Residential Design Supplementary Planning Document. In addition, it is considered that the scheme represents a failure of good design that would be contrary to paragraph 135(f) of the National Planning Policy Framework.
  3. The development as proposed fails to provide adequate quality useable/dedicated proposed outdoor amenity space for the residents of the proposed development. The outdoor amenity area is constrained by the size and appropriateness of the plot. The private amenity areas provided offers limited space/opportunities for private amenity and is of extremely poor quality which would not adequately serve the health or well-being of the occupants of/or be concordant 6-person 6-bedroom dwellinghouse. Consequently, the proposal is unacceptable and is considered contrary to Policy H10 of the Tameside Unitary Development Plan. In addition, it is considered that the scheme represents a failure of good design that would be contrary to paragraph 135(f) of the National Planning Policy Framework.
  4. Bedroom 1 and bedroom 2 located to the ground floor of the proposed accommodation offer a constrained outlook, limited exposure to natural light and compromised privacy, by reason of the dwelling being located to a busy high street and the proposed/existing built form within the rear yard. The development therefore fails to accord with paragraph 135(f) of the National Planning Policy Framework, and policies JP-H3 and JP-P1 of Places for Everyone.
  5. The proposed development would significantly intensify the residential use of the property without any provision for off street parking to serve future occupants. Due to the existing high levels of on street parking demand and stress within the area, the conversion to a 6-bedroom HMO would Planning Department, Tameside MBC, PO Box 304, Ashton Under Lyne, Tameside, OL6 0GA generate notably higher parking demands. In the absence of onsite parking, all parking demand associated with the HMO would be displaced onto the highway in a location already operating at or above practical capacity, the proposal would therefore worsen the parking practices and increase congestion, leading to obstruction and risk to surrounding residents. On this basis, the development would have an unacceptable impact on the safety and convenience of highway users and fails to demonstrate that safe and suitable access for all can be achieved. The development fails to accord with T1 and T10 of the Tameside Unitary Development Plan, policy JP-C8 of Places for Everyone and Sections 2 and 9 of the National Planning Policy Framework. NOTES FOR APPLICANT REASON FOR REFUSING PLANNING PERMISSION Statement under Article 35 (2) of the Town and Country Planning (Development Management Procedure) England Order 2015 (as amended): The proposal would not improve the economic, social and environmental conditions of the area nor does it comply with the development plan and therefore does not comprise sustainable development. There were no amendments to the scheme, or conditions which could reasonably have been imposed, which could have made the development acceptable and it was therefore not possible to approve the application. The Local Planning Authority has therefore implemented the requirement in Paragraph 39 of the NPPF. This decision refers to the following drawings submitted to the Council: Location Plan received 23 Decemeber 2025 Exsiting and Proposed Plans and Elevations received 13th January 2026 Nicola Elsworth Strategic Growth Programme Director Planning Department, Tameside MBC, PO Box 304, Ashton Under Lyne, Tameside, OL6 0GA

From the council's decision notice.

Application details

Postcode
M43 7HL

Planning application dates

Date validated
13 January 2026

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Flood zone 1: Low probability (rivers and sea)

Not published by this council, so not checked: Article 4 directions. Ask the council if these matter.

Possibly incomplete for this council: conservation areas and tree preservation orders.

Also checked, none recorded (21)

flood storage areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Tameside

Track this application

Get email alerts when there is a planning decision or status change.

Get email alerts near M43

New planning applications delivered to your inbox daily.

Around this site

For applicants and trades

What's been approved on your street?

See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.

Get The Signal Report