147 Moorside Street Droylsden Tameside M43 7HQ
Refused on 9 March 2026
Council decision: Refuse4 reasons for refusal
Proposal
Change of use from a 4-bedroom dwelling house (Use Class C3) to a 5-bedroom HMO (Use Class C4)
- Received
- 23 December 2025
- ReceivedReceived23 Dec
- ValidatedValidated13 Jan
- Consult.Consultation
- TargetTarget Date
- DecidedDecided9 Mar
Decided in 55 days
About this application
This is a planning application for a change of use at 147 Moorside Street Droylsden Tameside M43 7HQ. Tameside has handled 5,470 applications of this type. This one was decided in 55 days, 6 days longer than Tameside's typical decision time. The site is in a conservation area. There has been 1 other application at this address. We hold 861 applications in total for the M43 postcode area.
Why it was refused
- It is not considered that the building is suited to residential development in a manner that can achieve an acceptable design. The building represents a significant intensification of use which would comprise of overdevelopment of the site. The proposl is therefore contrary to policies C1: Townscape and Urban Form and H10: Detailed Design of Housing Developments of the Tameside Unitary Development Plan, Policy RD3: Efficient use of Land of the Tameside Residential Design Supplementary Planning Document and the National Planning Policy Framework.
- The building does not lend itself to residential accommodation on a scale which is proposed. By reason of the communal space available, the proposed kitchen and dining facilities are considered inadequate to cater for the needs of up to five occupants. The lack of such internal shared facility space, results in individual quarters being used as the primary living space, the culmulative impacts of such leads to detrimental impact upon the quality of residential environment created. The accommodation proposed fails to meet the needs of potential occupiers creating a poor standard and poor quality of amenity for future residents. The proposal would conflict with Policy H10 of the Tameside Unitary Development Plan, and Policies RD11, RD12 and RD18 of the Tameside Residential Design Supplementary Planning Document. In addition, it is considered that the scheme represents a failure of good design that would be contrary to paragraph 135(f) of the National Planning Policy Framework.
- Due to the close proximity to the highway and lack of separation from the footpath, bedroom 1 of the proposed development is subject to increased noise and disturbance from vehicle and pedestrian movements, in addition to poor outlook and privacy. The amenity of the future occupier would be detrimentally compromised, which is contrary to paragraph 135(f) of the National Planning Policy Framework, and policies JP-H3 and JP-P1 of Places for Everyone.
- The development would intensify the residential use of the property without providing any off street parking to meet the needs of future occupants. Moorside Street already experiences high levels of on street parking demand, with limited spare capacity and frequent overspill associated with existing residential properties along the street and in the surrounding area. The proposed HMO is expected to generate higher parking demand than the existing single household dwelling, all associated parking demand would be displaced onto the public highway in an area already operating at or close to saturation. For these reasons, the development is considered to have an unacceptable impact on the safety and convenience of highway users and fails to demonstrate that safe and suitable access for all can be achieved. The development therefore fails to accord with policies T1 and T10 of the Tameside Unitary Development Plan, policy JP-C8 of Places for Everyone and Sections 2 and 9 of Planning Department, Tameside MBC, PO Box 304, Ashton Under Lyne, Tameside, OL6 0GA the National Planning Policy Framework. NOTES FOR APPLICANT REASON FOR REFUSING PLANNING PERMISSION Statement under Article 35 (2) of the Town and Country Planning (Development Management Procedure) England Order 2015 (as amended): The proposal would not improve the economic, social and environmental conditions of the area nor does it comply with the development plan and therefore does not comprise sustainable development. There were no amendments to the scheme, or conditions which could reasonably have been imposed, which could have made the development acceptable and it was therefore not possible to approve the application. The Local Planning Authority has therefore implemented the requirement in Paragraph 39 of the NPPF. This decision refers to the following drawings submitted to the Council: Location Plan received 23rd December 2025 Existing and Proposed Plans and Elevations received 13th January 2026 Nicola Elsworth Strategic Growth Programme Director Planning Department, Tameside MBC, PO Box 304, Ashton Under Lyne, Tameside, OL6 0GA
From the council's decision notice.
Application details
- Postcode
- M43 7HQ
Planning application dates
- Date validated
- 13 January 2026
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions. Ask the council if these matter.
Possibly incomplete for this council: conservation areas and tree preservation orders.
Also checked, none recorded (21)
flood storage areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
1 other application at this property, newest first.
Source: Tameside
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near M43
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- 147 Moorside Street Droylsden Tameside M43 7HQ25/00649/CPUD · OutlineWithdrawn0.0 mi
- 143 Moorside Street Droylsden Tameside M43 7HQ11/01021/FUL · FullApproved0.0 mi
- 153 Moorside Street Droylsden Tameside M43 7HQ04/00457/FUL · FullApproved0.0 mi
- Land Adjacent 162 Moorside Street Droylsden Tameside16/00017/FUL · FullApproved0.0 mi
- 2 Bower Terrace Droylsden Tameside M43 7GQ24/00218/CPUD · OutlineApproved0.0 mi
For applicants and trades
Contractors near this project
Find contractors for change of use near this site- Undisputed Waste ServicesVerifiedManchesterHouse clearanceGarage clearance4.0 mi
- Freewater Electric LimitedElectricianBuilding controls0.1 mi
- Lee Barker Electrical InstallationsElectrician0.2 mi
- SDM Contracting (NW) LtdElectrician0.4 mi
What's been approved on your street?
See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.
Get The Signal Report