Construction of a new pontoon, consisting of: a steel bridgehead platform with GRP mesh decking fixed to the wall; 4no. connected glassfibre concrete deck pontoons which rise up and down, 4no. steel vertical guide columns and a hinged steel bridge with GRP mesh decking linking the two, guardrails and gates to the edge of the quayside and the bridgehead platform of stainless steel; and around the pontoons of galvanised steel, 5m high aluminium lighting columns and safety and rescue aids (application for Listed Building Consent)

2022/1700/LBC

Small
Heritage

River Tawe Quay Of Former Hafod Copperworks Swansea

Submitted14 Jul
Validated
Consultation
Target
Decided6 Sept
8 weeks typical decision time in Swansea95% of heritage applications approved

This is a heritage application at River Tawe Quay Of Former Hafod Copperworks Swansea. Swansea has handled 84 applications of this type and approves nearly all of them, typically deciding them in 74 days. This one was decided in 54 days, 3 weeks quicker than Swansea's median. There have been 5 other applications at this address. In the past year there have been 45 applications across Landore - Area 1.

Track this application

Get email alerts when there is a planning decision or status change.

Application Details

Reference
2022/1700/LBC
Address
River Tawe Quay Of Former Hafod Copperworks Swansea
Local Authority
Swansea
Application Type
Heritage
Scale / Size
Small
Decision Status
Permitted

Applicant & Agent

Planning Application Dates

Consultation Expiry
6 September 2022
Date Decided
6 September 2022
Date Submitted
14 July 2022

Planning Decision

Publicity

Appeal

Additional Information

Coordinates
51.637474, -3.934905