Skip to content

Bramford to Twinstead

SCC/0124/26/DoRDischarge of Requirements (Bramford to Twinstead)Awaiting decision
Discharge / amendments
The council did not publish a location for this application.

Proposal

Formal Submission in accordance with Requirement11(1) of the National Grid (Bramford to Twinstead Reinforcement) Order 2024 (the Order), National Grid are formally submitting the access design for AB-DAP2. This access is located on Pigeons Lane near Hintlesham and is in Stage 9 of the authorised development.

Received
28 July 2026
Decision expected
Overdue
  1. Received28 Jul
  2. Validated29 Jul
  3. Consult.19 Aug
  4. Target
  5. Decided

Have your say

Comments close on 19 August.

About this application

This is an application to discharge conditions at Bramford to Twinstead. Suffolk has handled 63 applications of this type. It has been with the council since 28 July 2026 and is still awaiting a decision. The site is in 3 listed buildings nearby. There have been 38 other applications at this address.

100% of conditions applications at Suffolk County Council were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Discharge of Requirements (Bramford to Twinstead)
Scale / size
Small

Planning application dates

Date validated
29 July 2026
Consultation expiry
19 August 2026
Consultation end
19 August 2026

Additional information

Documents
6

Site constraints

Designations that overlap or adjoin the site outline.

  • Flood zone 1: Low probability (rivers and sea)

Possibly incomplete for this council: conservation areas, Article 4 directions, tree preservation orders and brownfield registers.

Also checked, none recorded (20)

flood storage areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves and heritage coasts.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Planning history at this site

20 other applications at this property, newest first.

  1. 2026
    5 Nov

    Draft submission seeking advice on Requirement 4(1)(c) – Construction Traffic Management Plan for Stage 11.2…

    PendingApplicationSCC/0177/26/DoR/PreApp
  2. 2026
    4 Nov

    Formal Submission, Schedule 3, Requirement 11(1) of the BTNO Order 2024 – Access Design AB-AP2b - Stage 3.4…

    PendingDischarge of conditionsSCC/0178/26/DoR
  3. 2026
    2 Nov

    Draft submission seeking advice on Requirement 4(1)(c) – Construction Traffic Management Plan for Stage 11.2…

    PendingDischarge of conditionsSCC/0177/26/DoRPreApp
  4. 2026
    16 Oct

    Formal Submission, Schedule 3, Requirement 11(1) – Access Design AB-AP16 - STAGE 3.2

    PendingApplicationSCC/0171/26/DoR
  5. 2026
    9 Oct

    Formal submission In accordance with Requirement11(1) of the National Grid (Bramford to Twinstead…

    PendingApplicationSCC/0171/26
  6. 2026
    2 Oct

    Formal Submission - Requirement 11(1) of the National Grid (Bramford to Twinstead Reinforcement) Order 2024…

    PendingApplicationSCC/0165/26/DoR

Source: Suffolk

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.