26 Cherry Orchard Henley-in-Arden B95 5JW
Approved on 1 December 2022
Council decision: Permission with Conditions
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Demolition of garage and outbuildings, erection of two storey side and rear extensions and single storey front and rear extensions. New dropped kerb to front of property. New boundary fence and access gates to side boundary.
- Received
- 2 September 2022
- Ward
- Henley-in-Arden
- ReceivedReceived2 Sep
- ValidatedValidated13 Sep
- Consult.Consultation29 Nov
- TargetTarget Date8 Nov
- DecidedDecided1 Dec
Decided in 79 days (council typically 49)
About this application
This is a full planning application for demolition at 26 Cherry Orchard Henley-in-Arden B95 5JW. Stratford on Avon has handled 2,465 applications of this type. This one was decided in 90 days, 6 weeks longer than Stratford on Avon's typical decision time. There are no previous applications recorded at this address. In the past year there have been 66 applications across Henley-in-Arden. We hold 984 applications in total for the B95 postcode area.
85% of full applications at Stratford-on-Avon District Council were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- B95 5JW
- Application type
- Full Application
- Scale / size
- Small
- Parish
- Henley-in-Arden
Planning application dates
- Date validated
- 13 September 2022
- Consultation expiry
- 29 November 2022
- Consultation start
- 4 October 2022
- Consultation end
- 29 November 2022
- Neighbour consultation start
- 13 September 2022
- Neighbour consultation end
- 4 October 2022
- Target decision date
- 8 November 2022
- Application expires
- 26 October 2022
- Permission expires
- 1 December 2025
Applicant and agent
- Agent address
- The Old Bakery House Heath Farm (Beckett's Farm), Wythall B47 6AJ
Planning decision
- Statutory period
- 56 days
Publicity
- Site notice start
- 3 October 2022
- Site notice end
- 26 October 2022
Additional information
- Documents
- 25
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: Stratford on Avon
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near B95
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- 24 Cherry Orchard Henley-in-Arden Warwickshire B95 5JW06/03117/FUL · FullApproved0.0 mi
- 24 Cherry Orchard Henley-in-Arden Warwickshire B95 5JW01/03074/FUL · FullApproved0.0 mi
- Aspen Court And Blackthorn Court Chestnut Walk Henley-in-Arden Warwickshire05/00020/TPO · TreesApproved0.0 mi
- St Leonards Chestnut Walk Henley-in-Arden Warwickshire B95 5JN07/03453/FUL · FullApproved0.0 mi
- Dell Court Cherry Orchard Henley-In-Arden Warwickshire B95 5FW23/01040/TPO · TreesApproved0.0 mi
For applicants and trades
Contractors near this project
Find contractors for extensions near this site- Corelec LtdVerifiedElectrician6.5 mi
- RJW Renovations0.1 mi
- J B I ServicesElectrician0.5 mi
- DCT ElectricalElectrician0.5 mi
Planning something similar?
See what the council approved and refused for two-storey and first-floor extensions on your street. Pick your home and get the evidence before you pay for drawings.