Blackwell Business Centre Blackwell Shipston-on-Stour Warwickshire
Approved on 26 September 2003
Council decision: Permission with conditions
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Removal of existing slurry tower and replace with new light industrial unit together with all associated works.
- Received
- 14 July 2003
- Ward
- Tredington WardView Councillors
- ReceivedReceived14 Jul
- ValidatedValidated4 Aug
- Consult.Consultation29 Aug
- TargetTarget Date29 Sep
- DecidedDecided26 Sep
Decided in 53 days (council typically 49)
About this application
This is a full planning application at Blackwell Business Centre Blackwell Shipston-on-Stour Warwickshire. Stratford on Avon has handled 2,465 applications of this type. This one was decided in 74 days, 4 weeks longer than Stratford on Avon's typical decision time. The site is in a conservation area. There has been 1 other application at this address.
85% of full applications at Stratford-on-Avon District Council were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Full Application
- Scale / size
- Small
- Parish
- Tredington
Planning application dates
- Date validated
- 4 August 2003
- Consultation expiry
- 29 August 2003
- Consultation start
- 5 August 2003
- Neighbour consultation start
- 8 August 2003
- Neighbour consultation end
- 29 August 2003
- Target decision date
- 29 September 2003
- Application expires
- 2 September 2003
- Permission expires
- 26 September 2008
Applicant and agent
- Agent address
- John Bradley Associates 40 Church Street SHIPSTON-ON-STOUR Warwickshire CV36 4AS
Planning decision
- Statutory period
- 56 days
Additional information
- Documents
- 1
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 3: High probability (rivers and sea)Part of the site
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
1 other application at this property, newest first.
Source: Stratford on Avon
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- New Farm Blackwell Shipston-on-Stour Warwickshire00/02394/FUL · FullApproved0.0 mi
- Blackwell Business Centre Blackwell Shipston-on-Stour Warwickshire06/02415/ADV · AdvertisingApproved0.0 mi
- Blackwell Business Centre Darlingscote Road Blackwell Tredington Warwickshire CV36 4PE23/00161/LDE · AmendmentApproved0.0 mi
- Unit 10,11,24 And 26 Blackwell Business Centre Blackwell Shipston-on-Stour Warwickshire CV36 4PE09/01148/FUL · FullApproved0.0 mi
- Honeysuckle House Darlingscote Road Blackwell Tredington Warwickshire CV36 4PE24/01141/LDE · AmendmentApproved0.0 mi
For applicants and trades
Contractors near this project
- Hawkscroft LtdWindow & Door Installers1.0 mi
- Alderminster Electrics LtdElectricianAlternative Power Supplies1.3 mi
- Holdsworth Windows LtdWindow & Door Installer1.4 mi
- Adrian Thombs ElectricalElectrician1.6 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.