Skip to content

Unit 12 Conduit Road, Norton Canes, Cannock

CH.19/01/778 WApplication for Full Planning Permission for a 'major development'Approved
Full

Approved on 27 September 2019

Council decision: GRANTED - WITH CONDITIONSDelegated (officer decision)

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Retrospective application for recycling and storage facility for non hazardous and hazardous waste

Submitted
11 June 2019
Decision level
Delegated (officer decision)
  1. Received11 Jun
  2. Validated11 Jun
  3. Consult.
  4. Target10 Sep
  5. Decided27 Sep

Decided in 108 days (council typically 49)

About this application

This is a full planning application at Unit 12 Conduit Road, Norton Canes, Cannock. Staffordshire has handled 200 applications of this type. This one was decided in 108 days, 8 weeks longer than Staffordshire's typical decision time. The site is in a conservation area. There are no previous applications recorded at this address.

100% of full applications at Staffordshire County Council were approved. Across all application types, the council typically decides in about 7 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Application for Full Planning Permission for a 'major development'
Scale / size
Large
Parish
Norton Canes
District
Cannock Chase District

Planning application dates

Date validated
11 June 2019
Target decision date
10 September 2019

Planning decision

Statutory period
91 days

Additional information

Planning Portal ID
PP-07664022v1
UPRN
MAN012823
Documents
14

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Flood zone 1: Low probability (rivers and sea)

Possibly incomplete for this council: conservation areas, Article 4 directions, tree preservation orders and brownfield registers.

Also checked, none recorded (20)

flood storage areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves and heritage coasts.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Staffordshire

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.