Tower Bridge Road, SE1 2UP
Proposal
Refurbishment of the C-Yard roof, including renewal of roof coverings, widening of perimeter lead gutters, reduction of roof glazing, installation of access gates to the North and South of the roof, increase in height of parapet walls, installation of new metal railings, and thermal upgrades through increased roof insulation and replacement roof glazing.
- Received
- 29 July 2025
- Decided
- 3 September 2025
- Council
- London Borough of Southwark
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
- ReceivedSubmitted29 Jul
- ValidatedValidated
- Consult.Consultation
- TargetTarget Date
- DecidedDecided3 Sep
Decided in 36 days (council typically 49)
This is a planning application for window replacement at Tower Bridge Road, SE1 2UP. Southwark has handled 266 applications of this type and approves nearly all of them, typically deciding them in 47 days. This one was decided in 36 days, 11 days quicker than Southwark's median. The site is in the Tower Bridge conservation area, with 5 listed buildings nearby. There has been 1 other application at this address. In the past year there have been 8 applications across LBWB. We hold 2,143 applications in total for the SE1 postcode area.
Application Details
Applicant & Agent
Planning Application Dates
Planning Decision
Publicity
Appeal
Additional Information
Source: Southwark
Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near SE1
New planning applications delivered to your inbox weekly.
Associated applications
- 202529 Jul
Refurbishment of the C-Yard roof, including renewal of roof coverings, widening of perimeter lead gutters…
ApprovedAll OtherFiled alongside25/AP/2075 - 202529 Jul
Refurbishment of the C-Yard roof, including renewal of roof coverings, widening of perimeter lead gutters…
This applicationApprovedAll Other25/AP/2076
Planning history at this site
10 other applications at this property, newest first.
- 202610 Aug
Temporary advertisement consent to display 1x Pride Progress flag on the high-level footway of Tower Bridge…
ApprovedAdvertisement consent26/AP/2290 - 202523 Jul
Maintenance works to the three 'mud tanks' of Tower Bridge, to repair and re-line the tanks, as well as to…
ApprovedListed building consent25/AP/1881 - 202522 Jul
The removal of the existing sprinkler system within the North and South towers of Tower Bridge while…
ApprovedListed building consent25/AP/2078 - 20256 May
Certificate of Lawfulness (works to a listed building) for replacement of the 1970s hydraulic motors, which…
ApprovedCertificate of Lawfulness - Listed Bldng25/AP/1336 - 202530 Apr
Certificate of lawfulness (proposed works to a listed building) for replacement of hydraulic motors.
WithdrawnAll Other25/AP/1299 - 202523 Apr
Listed building consent for replacement of previously modernised timber floorboards and metal ladders…
ApprovedListed building consent25/AP/1189 - 202517 Apr
Certificate of Lawfulness (works to a listed building) for installation of additional lifebuoys on the…
ApprovedCertificate of Lawfulness - Listed Bldng25/AP/1175 - 202322 Dec
Listed Building Consent for the installation of jumbrellas, planters and screens to enclose existing seating…
ApprovedListed building consent23/AP/3566 - 202322 Dec
Installation of jumbrellas, planters and screens to enclose existing seating area.
ApprovedMinor application23/AP/3565 - 202316 Jun
Listed building consent: Installation of new CCTV camera to the South Abutment of Tower Bridge
ApprovedListed building consent23/AP/1690
Planning constraints
Designations that overlap or adjoin the site outline.
- Flood zone 3: High probability (rivers and sea)Part of the site
- Conservation area: Tower Bridge
- Listed building: Grade II: Accumulator Tower and Chimney Stack to East Side of Tower Bridge ApproachOn this site · +2 more
- Article 4 direction: Central Activities Zone+1 more
- Tree Preservation Order: Ref 521Part of the site · +4 more
Also checked, none recorded (20)
flood storage areas, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-10-09. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
What's been approved on your street?
See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.