Thames Tideway Tunnel At Chambers Wharf Chambers Street London Southwark SE16
Approved on 27 June 2024
Council decision: AOD - GrantedDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Formal application for the Discharge of (Operational Noise) pursuant to Requirement PW14 of Schedule 3 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (the Order) (as amended)(hereafter referred to as The Order) for the works at Chambers Wharf (CHAWF) work site only.
- Received
- 16 May 2024
- Decision level
- Delegated (officer decision)
- Council
- London Borough of Southwark
- Ward
- North Bermondsey
- ReceivedReceived16 May
- ValidatedValidated20 May
- Consult.Consultation
- TargetTarget Date14 Jul
- DecidedDecided27 Jun
Decided in 38 days (council typically 49)
About this application
This is an application to discharge conditions at Thames Tideway Tunnel At Chambers Wharf Chambers Street London Southwark SE16. Southwark has handled 1,341 applications of this type. This one was decided in 42 days, 7 days quicker than Southwark's typical decision time. There have been 2 other applications at this address. In the past year there have been 59 applications across North Bermondsey.
97% of conditions applications at London Borough of Southwark were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Approval of Details
- Scale / size
- Small
- Parish
- Bermondsey And Rotherhithe
Planning application dates
- Date validated
- 20 May 2024
- Target decision date
- 14 July 2024
- Permission expires
- 27 June 2029
Planning decision
- Statutory period
- 55 days
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 3: High probability (rivers and sea)
- Conservation area: Edward III's RotherhitheNext to the site
- Article 4 direction: Site allocation NSP15: Chambers Wharf
- Brownfield land register: Chambers Wharf Chambers Street London SE16 4XQRegister site at or near this address · +2 more
Also checked, none recorded (21)
flood storage areas, listed buildings, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves and heritage coasts.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
4 other applications at this property, newest first.
- 202617 Apr
Formal application for Full Discharge of final Site-Specific Requirement CHAWF6 (Contaminated Land - Part 3…
ApprovedDischarge of conditions26/AP/0123 - 202521 Apr
Temporary retention of the existing Tideway site office and welfare facilities following the completion of…
ApprovedAll Other24/AP/2098 - 202531 Jan
Partial Approval of the Partial Discharge of site-specific requirement CHAWF6 (Contaminated Land - Part 3…
ApprovedDischarge of conditions25/AP/0126 - 202424 Apr
Discharge of (Air Management Plan) pursuant to Requirement PW7(3) of Schedule 3 of the Thames Water Utilities…
ApprovedDischarge of conditions24/AP/1176
Source: Southwark
Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- Thames Tideway Tunnel At Chambers Wharf Chambers Street London Southwark SE1624/AP/1176 · ConditionsApproved0.0 mi
- 46 Farncombe Street London Southwark SE16 4PT26/AP/0483 · AmendmentApproved0.1 mi
- Riverside Primary School Janeway Street London Southwark SE16 4PS24/AP/1876 · ConditionsApproved0.1 mi
- Riverside Primary School Janeway Street London Southwark SE16 4PS24/AP/0798 · AmendmentApproved0.1 mi
- 3 Emba Street London Southwark SE16 4PL24/AP/1137 · TreesApproved0.1 mi
For applicants and trades
Contractors near this project
- Building Services LondonVerifiedLondonExtensionsLoft Conversions2.9 mi
- Orient Construction Consultancy LimitedVerifiedLondon3.2 mi
- Avent Roofing ServicesVerifiedWestminsterRoofing3.3 mi
- Atlas South Technical Service LimitedVerifiedLondonProperty MaintenanceHandyman3.6 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.