Skip to content

39 Hadleigh Road Leigh-on-sea Essex SS9 2DY

26/01147/FULHRefused

Refused on 26 October 2026

Council decision: Refuse Permission1 reason for refusal

Approximate location: the centre of the postcode, not the exact property.

Proposal

Raise height of boundary wall to a maximum of 1.5m, install new entrance gate to match existing, erect timber open framed carport to south of existing garage

Received
30 August 2026
Public comments
0 · last counted 29 October 2026
  1. Received30 Aug
  2. Validated31 Aug
  3. Consult.
  4. Target
  5. Decided26 Oct

Decided in 56 days

About this application

This is a planning application for a garage at 39 Hadleigh Road Leigh-on-sea Essex SS9 2DY. Southend has handled 5,226 applications of this type. This one was decided in 57 days. The site is in the Leigh conservation area. There have been 5 other applications at this address. We hold 2,525 applications in total for the SS9 postcode area.

Why it was refused

  1. The proposed car port, by reason of its scale, lack of subservience and siting would be a prominently incongruous and dominant feature within the streetscene, resulting in demonstrable harm to the character and appearance of the site, streetscene and Leigh Conservation area. This is unacceptable and contrary to the National Planning Policy Framework (2026), Core Strategy (2007) Policies KP2 and CP4, Policies DM1, DM3 and DM5 of the Development Management Document (2015) and advice contained within the Design and Townscape Guide (2009).

From the council's decision notice.

Application details

Postcode
SS9 2DY

Planning application dates

Date validated
31 August 2026

Planning decision

Case officer
Jennifer Doherty

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations at the address point. Ones next to the site may also apply.

  • Conservation area: Leigh Conservation Area
  • Flood zone 1: Low probability (rivers and sea)

Not published by this council, so not checked: Article 4 directions. Ask the council if these matter.

Possibly incomplete for this council: tree preservation orders.

Also checked, none recorded (21)

flood storage areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Southend

Track this application

Get email alerts when there is a planning decision or status change.

Get email alerts near SS9

New planning applications delivered to your inbox daily.

Around this site

For applicants and trades

What's been approved on your street?

See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.

Get The Signal Report