Upton Marshes On The Right Bank Of The River Bure And The Left Bank Of Upton Dyke
Approved on 4 July 2006
Council decision: Approval with ConditionsBroads Authority
Proposal
Strengthening, Rollback and Setback of Floodbank, Installation of Erosion Protection and Maintenance of Piling, Temporary Site Compounds and Associated Engineering Works
- Received
- 5 April 2006
- Decision level
- Broads Authority
- Ward
- Blofield With South Walsham
- Agent
- Broadland Environmental Services Ltd
- ReceivedReceived5 Apr
- ValidatedValidated5 Apr
- Consult.Consultation
- TargetTarget Date31 May
- DecidedDecided4 Jul
Decided in 90 days (council typically 49)
About this application
This is a full planning application at Upton Marshes On The Right Bank Of The River Bure And The Left Bank Of Upton Dyke. South Norfolk Broadland has handled 7,102 applications of this type. This one was decided in 90 days, 6 weeks longer than South Norfolk Broadland's typical decision time. There are no previous applications recorded at this address. In the past year there have been 11 applications across Blofield With South Walsham.
94% of full applications at South Norfolk District Council were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Full
- Scale / size
- Small
- Parish
- Upton With Fishley
Planning application dates
- Date validated
- 5 April 2006
- Target decision date
- 31 May 2006
- Permission expires
- 4 July 2009
Applicant and agent
- Agent
- Broadland Environmental Services Ltd
- Agent address
- Third Floor Grosvenor House 112-114 Prince Of Wales Road Norwich NR1 1NS
Planning decision
- Statutory period
- 56 days
Publicity
- Site notice start
- 18 April 2006
Site constraints
Designations at the address point. Ones next to the site may also apply.
- Flood zone 3: High probability (rivers and sea)
- National park: The Broads
Also checked, none recorded (23)
flood storage areas, conservation areas, listed buildings, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: South Norfolk Broadland
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- Rivers Edge Near Boundary Farm Staithe River Bure Ashby With Oby NorfolkBA/2016/0362/FUL · FullApproved0.2 mi
- Land Adj Boundary Farm Staithe River Bure Ashby With Oby NorfolkBA/2016/0395/FUL · FullApproved0.2 mi
- Bureside Holiday Park Boundary Farm Boundary Road Ashby With Oby Norfolk NR29 3BWBA/2013/0138/FUL · FullApproved0.3 mi
- Bureside Holiday Park Boundary Farm Boundary Road Ashby With Oby Norfolk NR29 3BWBA/2010/0320/SCREEN · OutlineApproved0.3 mi
- Compartment 9 (Final Phase) Left Bank Of The River Bure Between Thurne Mouth And Acle BridgeBA/2014/0297/FUL · FullApproved0.3 mi
For applicants and trades
Contractors near this project
- Green Home Energy SolutionsBiomass BoilerSolar Panel Installer1.4 mi
- A.S.A.P Electrical ServicesElectricianElectric Vehicle Charging Point Installers1.6 mi
- Switched on ElectricalElectrician1.7 mi
- GJ Kirk Installations LtdWindow & Door Installer1.7 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.