Hardham Water Supply Works London Road Hardham West Sussex RH20 1LB
Proposal
Permitted Development Notification at Hardham Water Supply Works - Proposed Installation of Buffer Tanks
- Received
- 10 March 2026
- Decision due
- 31 March 2026
- Decision level
- Delegated (officer decision)
- Council
- South Downs
- Ward
- Pulborough, Coldwatham and Amberley
- Agent
- Stantec UK Limited
- ReceivedReceived10 Mar
- ValidatedValidated10 Mar
- Consult.Consultation
- TargetTarget Date31 Mar
- DecidedDecided
Have your say
About this application
This is an outline application at Hardham Water Supply Works London Road Hardham West Sussex RH20 1LB. South Downs has handled 1,978 applications of this type. It has been with the council since 10 March 2026 and is still awaiting a decision. There are no previous applications recorded at this address. In the past year there have been 46 applications across Pulborough, Coldwatham and Amberley. We hold 2,888 applications in total for the RH20 postcode area.
87% of outline applications at South Downs were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.See what's approved near your address
Application details
- Postcode
- RH20 1LB
- Application type
- Statutory Undertaking PD
- Scale / size
- Small
- Parish
- Coldwaltham Parish Council
Planning application dates
- Date validated
- 10 March 2026
Applicant and agent
- Agent
- Stantec UK Limited
- Architect profile
- STANTEC UK LIMITED
Southern Water Services Limited
Company number 02366670
- Status
- Active
- Type
- Private limited company
- Incorporated
- 1 Apr 1989 (37 years old)
- Nature of business
- Water collection, treatment and supply; Sewerage; Technical testing and analysis
- Registered office
- Worthing
4 other planning applications by this company in New Forest (District), NSIP England and Test Valley.
- 26/02356/FULLN · Test Valley · Southern Water Depot River Way Andover Hampshire SP10 1DX
- 26/10928 · New Forest (District) · TESTWOOD PUMPING STATION, NUTSEY CLOSE, TOTTON SO40 3QU
- 26/10312 · New Forest (District) · TESTWOOD PUMPING STATION, NUTSEY CLOSE, TOTTON SO40 3QU
- WA010002 · NSIP England · The project is located in Hampshire, South East England, extending from Havant on the south coast, to Otterbourne near Winchester. The proposed Water Recycling Plant would be located off Harts Farm Way in Havant.
Company information from Companies House.
Planning decision
- Statutory period
- 21 days
Additional information
- Documents
- 4
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 2: Medium probability (rivers and sea)Part of the site
- National park: South Downs
Possibly incomplete for this council: Article 4 directions and tree preservation orders.
Also checked, none recorded (21)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: South Downs
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near RH20
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Hardham Water Treatment Works London Road Hardham West Sussex RH20 1LASDNP/26/01642/DCONDB · ConditionsAwaiting decision0.2 mi
- Land West of Hardham Mill Business Park London Road Hardham West Sussex RH20 1LBSDNP/26/00087/FUL · FullAwaiting decision0.2 mi
- St Botolphs Church London Road Hardham West Sussex RH20 1LBSDNP/26/00156/DDDT · TreesApproved0.3 mi
- Rother House London Road Hardham West Sussex RH20 1LASDNP/26/00410/HOUS · FullAwaiting decision0.3 mi
- St Botolphs Church London Road Hardham West Sussex RH20 1LBSDNP/25/03931/TCA · TreesApproved0.3 mi
For applicants and trades
Before the decision
You may need a flood risk assessment. Drainage & flood risk consultants near this site
The site is in flood zone 2 (Environment Agency).
- 9.5 miMidhurstRTPI
- 13.3 miChichester
- 19.4 miCrawley
Nearest first, within 25 miles of the site. Every firm is listed free.
Contractors near this project
- Hunter DevelopmentVerifiedHorshamChange of UseNew Builds2.8 mi
- Snugg Systems LtdPlumber & Heating Engineer0.6 mi
- Lee SweepsSolid Fuel Heating0.8 mi
- DS Electrical Contractors LtdAlternative Power SuppliesAudio Visual1.7 mi
What's been approved on your street?
See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.
Get The Signal Report