Land To East New Road Drax Selby North Yorkshire

2022/0711/EIAApplication submitted with EIAApproved
Outline / PiP

Approved on 11 August 2023

Council decision: PermittedPlanning committee

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters reserved) for the construction of a converter station at Drax, Selby; (Part 2) full planning application for the installation of high voltage direct current (HVDC) underground cables from the River Ouse to the converter station and high voltage alternating current (HVAC) underground cables from the converter station to the existing Drax Substation as well as all associated temporary works including compounds, accesses and bellmouths as part of the construction of Scotland-England Green Link 2 (SEGL2), a two gigawatt (GW) reinforcement of the electricity transmission system between Peterhead, Scotland and Drax, England. [Installation of underground HVDC cables from Mean Low Water Springs (MLWS) at Fraisthorpe, East Riding to the River Ouse and associated temporary works relating to land in an adjoining authority]

Received
14 June 2022
Decision level
Planning committee
Public comments
23
Council
Selby
Ward
Camblesforth And Carlton
  1. Received14 Jun
  2. Validated12 Aug
  3. Consult.9 Jun
  4. Target11 Aug
  5. Decided11 Aug

Decided in 364 days (council typically 56)

About this application

This is an outline application at Land To East New Road Drax Selby North Yorkshire. Selby has handled 341 applications of this type. This one was decided in 423 days, 52 weeks longer than Selby's typical decision time. There has been 1 other application at this address. In the past year there have been 34 applications across Camblesforth And Carlton.

78% of outline applications at Selby were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Application submitted with EIA
Scale / size
Large
Parish
Long Drax Parish Council

Planning application dates

Date validated
12 August 2022
Consultation expiry
7 September 2023
Consultation start
2 June 2023
Consultation end
9 June 2023
Last date for comments
9 June 2023
Target decision date
11 August 2023
Committee meeting
8 August 2023
Permission expires
11 August 2026

Applicant and agent

Agent
AECOM
Agent address
AECOM One Trinity Gardens Broad Chare Newcastle Upon Tyne NE1 2HF

Planning decision

Statutory period
364 days

Publicity

Last advertised
17 August 2023
Advertisement expiry
7 September 2023
Site notice start
31 August 2022
Site notice end
21 September 2022

Additional information

Documents
130
Constraints
69

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Flood zone 3: High probability (rivers and sea)

Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.

Also checked, none recorded (22)

flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Associated applications

  1. 2026
    26 Jan

    Discharge of conditions 50 (CPP), 51 (CMS), 52 (trees), 53 (land restoration), 60 (contamination) of approval…

    Condition decisionDischarge of conditionsZG2026/0064/DOC
  2. 2026
    26 Jan

    Discharge of conditions 14 (Construction Environmental Management Plan), 18 (drainage), 19 (rate of…

    Condition decisionDischarge of conditionsZG2026/0065/DOC
  3. 2026
    15 Jan

    Discharge of conditions 39 (permanent water course crossing infrastructure), 40 (construction scheme) and 41…

    PendingDischarge of conditionsZG2026/0037/DOC
  4. 2025
    31 Oct

    Discharge of condition 02 (materials) of approval ZG2024/0241/REMM

    Condition decisionDischarge of conditionsZG2025/1120/DOC
  5. 2025
    16 May

    Discharge of condition 34 (landscape restoration scheme) of approval 2022/0711/EIA

    WithdrawnDischarge of conditionsZG2025/0512/DOC
  6. 2025
    14 May

    Discharge of condition 38 (construction drainage scheme) of approval 2022/0711/EIA

    Condition decisionDischarge of conditionsZG2025/0504/DOC
  7. 2025
    13 May

    Discharge of condition 35 (CEMP Ecological Management Plan) for planning permission 2022/0711/EIA

    Conditions part dischargedDischarge of conditionsZG2025/0493/DOC
  8. 2025
    9 May

    Discharge of conditions 35 (CEMP) and 45 (land contamination) of approval 2022/0711/EIA

    Condition decisionDischarge of conditionsZG2025/0485/DOC
  9. 2025
    6 May

    Discharge of conditions 35 (CEMP), 36 (CTMP) and 37 (CWTP) of approval 2022/0711/EIA

    Conditions part dischargedDischarge of conditionsZG2025/0467/DOC
  10. 2024
    25 Sep

    Discharge of condition 42 (archaeology) of approval 2022/0711/EIA

    Conditions part dischargedDischarge of conditionsZG2024/1014/DOC
  11. 2024
    7 Jun

    Non material amendment of approval 2022/0711/EIA

    ApprovedNon-material amendmentAmendmentZG2024/0589/MAN2
  12. 2024
    21 Mar

    Discharge of conditions 12 (external lighting), 16 (construction worker travel plan), 20 (maintenance of the…

    Condition decisionDischarge of conditionsZG2024/0272/DOC
  13. 2024
    12 Mar

    Discharge of conditions 14 (construction environmental management plan), 15 (construction traffic management…

    Condition decisionDischarge of conditionsZG2024/0247/DOC
  14. 2024
    11 Mar

    Reserved matters application including access, appearance, landscaping, layout and scale for the development…

    ApprovedReserved mattersRelatedZG2024/0241/REMM
  15. 2022
    14 Jun

    Hybrid Planning Application comprising two parts: (Part 1) Outline planning application (all matters…

    This applicationApprovedOutline2022/0711/EIA

Source: Selby

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Consultants on this application

  • AECOM · Agent for this application

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.