Skip to content

115 Cumpsty Road Litherland L21 9HY

DC/2026/01067Prior notification - household (42 days)Approved
Outline / PiP

Approved on 31 July 2026

Council decision: Prior Approval Not Required

Site boundary (council red line)

Proposal

Prior approval submission for a proposed rear extension projecting 4.97 metres from the rear wall of the original dwellinghouse with a height of 3.0 metres at the eaves and a maximum height of 3.50 metres (Valid from 23.06.2026).

Received
23 June 2026
Ward
Ford Ward
Agent
TAK Architects Ltd
  1. Received23 Jun
  2. Validated23 Jun
  3. Consult.
  4. Target
  5. Decided31 Jul

Decided in 38 days (council typically 56)

About this application

This is an outline application for a rear extension at 115 Cumpsty Road Litherland L21 9HY. Sefton has handled 368 applications of this type. This one was decided in 38 days, 3 weeks quicker than Sefton's typical decision time. There has been 1 other application at this address. In the past year there have been 28 applications across Ford Ward. We hold 106 applications in total for the L21 postcode area.

82% of outline applications at Sefton Metropolitan Borough Council were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.See what's approved near your address

Application details

Postcode
L21 9HY
Application type
Prior notification - household (42 days)
Scale / size
Small

Planning application dates

Date validated
23 June 2026

Applicant and agent

Applicant
Private applicant
Agent
TAK Architects Ltd
Architect profile
TAK ARCHITECTS LTD
Agent address
15 Paternoster Row The Workstation Studio 517 Sheffield S1 2BX GB

Planning decision

Case officer
Mrs K Campbell

Additional information

Documents
0

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (24)

flood storage areas, conservation areas, listed buildings, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Sefton

Track this application

Get email alerts when there is a planning decision or status change.

Get email alerts near L21

New planning applications delivered to your inbox daily.

Around this site

For applicants and trades

What's been approved on your street?

See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.

Get The Signal Report