Skip to content

Units 3b 4 And 5, Express Park, Bristol Road, Bridgwater, Somerset, TA6 4RN

09/26/00013Prior Approval for Solar PV - Non DomPermitted
Prior approval

Proposal

Application to determine if prior approval is required for a proposed installation of other Solar Photovoltaics (PV) equipment on the roofs of non-domestic buildings.

Received
6 August 2026
Decided
15 September 2026 · Prior Approval Approved
Decision level
Delegated (officer decision)
Council
Sedgemoor
Approximate location: the centre of the postcode, not the exact property.
  1. Received6 Aug
  2. Validated6 Aug
  3. Consult.
  4. Target
  5. Decided15 Sep

Decided in 40 days (council typically 35)

5 weeks typical decision time in Sedgemoor96% of applications approved

This is a planning application for a solar installation at Units 3b 4 And 5, Express Park, Bristol Road, Bridgwater, Somerset, TA6 4RN. Sedgemoor has handled 1 application of this type and approves nearly all of them, typically deciding them in 40 days. This one was decided in 40 days. There are no previous applications recorded at this address. We hold 1,325 applications in total for the TA6 postcode area.

Application Details

Reference
09/26/00013
Address
Units 3b 4 And 5, Express Park, Bristol Road, Bridgwater, Somerset, TA6 4RN
Postcode
TA6 4RN
Local Authority
Sedgemoor
Application Type
Prior Approval for Solar PV - Non Dom
Decision Status
Permitted
Parish
Bridgwater Without

Applicant & Agent

Planning Application Dates

Date Decided
15 September 2026
Date Validated
6 August 2026
Date Submitted
6 August 2026

Planning Decision

Decision
Prior Approval Approved
Decided By
Delegated
Case Officer
Jordan Morris

Publicity

Appeal

Additional Information

Coordinates
51.148586, -2.994789
Enriching application data
2/3
Council recordsAppealsFlood risk

Source: Sedgemoor

Track this application

Get email alerts when there is a planning decision or status change.

Get email alerts near TA6

New planning applications delivered to your inbox weekly.

Planning constraints

Designations that overlap or adjoin the site outline.

  • Flood zone 3: High probability (rivers and sea)Part of the site

Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.

Also checked, none recorded (22)

flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-10-09. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

What's been approved on your street?

See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.

Get The Signal Report