Unit A Kings Hill Business Park Darlaston Road Wednesbury WS10 7SH
Approved on 2 April 2026
Council decision: Grant Permission Subject to ConditionsPlanning committee
Proposal
Proposed division of existing building into two units for flexible use classes B2 and B8. Internal changes and associated elevation changes, new servicing, access, landscaping and associated works.
- Received
- 16 September 2025
- Decision level
- Planning committee
- Public comments
- 4
- Ward
- Wednesbury
- ReceivedReceived16 Sep
- ValidatedValidated30 Sep
- Consult.Consultation21 Oct
- TargetTarget Date10 Apr
- DecidedDecided2 Apr
Decided in 184 days (council typically 56)
About this application
This is a full planning application at Unit A Kings Hill Business Park Darlaston Road Wednesbury WS10 7SH. Sandwell has handled 2,543 applications of this type. This one was decided in 198 days, 20 weeks longer than Sandwell's typical decision time. There have been 7 other applications at this address. In the past year there have been 16 applications across Wednesbury. We hold 698 applications in total for the WS10 postcode area.
87% of full applications at Sandwell Metropolitan Borough Council were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- WS10 7SH
- Application type
- Full (Major)
- Scale / size
- Large
Planning application dates
- Date validated
- 30 September 2025
- Consultation expiry
- 30 October 2025
- Consultation end
- 21 October 2025
- Neighbour consultation start
- 30 September 2025
- Neighbour consultation end
- 21 October 2025
- Last date for comments
- 30 October 2025
- Target decision date
- 10 April 2026
- Committee meeting
- 1 April 2026
- Permission expires
- 2 April 2029
Applicant and agent
- Agent
- Stantec
- Agent address
- 3rd Floor 50-60 Station Road Cambridge CB1 2JH
Planning decision
- Statutory period
- 192 days
Publicity
- Last advertised
- 30 September 2025
- Advertisement expiry
- 30 October 2025
- Site notice start
- 1 October 2025
- Site notice end
- 22 October 2025
Additional information
- Planning Portal ID
- PP-14305911
- Documents
- 110
- Constraints
- 16
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (24)
flood storage areas, conservation areas, listed buildings, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Associated applications
- 202624 Jul
Proposed discharge of condition 11 of planning permission DC/25/71028
PendingDischarge of conditionsDOC/26/01052 - 202617 Jul
Proposed discharge of Condition 4a of planning permission DC/25/71028
PendingDischarge of conditionsDOC/26/01048 - 202616 Jun
Proposed discharge of conditions 5, 6 and 7 of planning permission DC/25/71028
ApprovedDischarge of conditionsDOC/26/01031 - 202616 Jun
Proposed discharge of condition 3 of planning permission DC/25/71028
ApprovedDischarge of conditionsDOC/26/01032 - 202627 Apr
Proposed discharge of condition 16 of planning permission DC/25/71028
ApprovedDischarge of conditionsDOC/26/01013 - 202516 Sep
Proposed division of existing building into two units for flexible use classes B2 and B8. Internal changes…
This applicationApprovedFullDC/25/71028
Planning history at this site
2 other applications at this property, newest first.
Source: Sandwell
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near WS10
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Unit A Kings Hill Business Park Darlaston Road Wednesbury WS10 7SHDOC/26/01013 · ConditionsApproved0.0 mi
- Unit A Kings Hill Business Park Darlaston Road Wednesbury WS10 7SHPD/25/03008 · OutlineApproved0.0 mi
- Unit A Kings Hill Business Park Darlaston Road Wednesbury WS10 7SHDC/19/63542 · FullApproved0.0 mi
- 63 Goldby Drive Wednesbury WS10 9LNDC/21/65671 · FullApproved0.0 mi
- Unit A Kings Hill Business Park Darlaston Road Wednesbury WS10 7SHDOC/26/01048 · ConditionsAwaiting decision0.1 mi
For applicants and trades
Contractors near this project
Find contractors for landscaping & driveways near this site- Brown's ElectricalVerifiedElectrician3.4 mi
- RCR Connections LtdVerifiedBirminghamRenovations & Refurbishments7.3 mi
- PRH Engineering Solutions LimitedElectrician0.1 mi
- Spectrum FM LtdElectrician0.1 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.