Lamp Posts On Bolton Road - Bridgewater Road, Manchester Road East - Hilton Lane, Ellesmere Street - Hilton Lane, Walkden Road - Park Road And Bridgewater Road - Hilton Lane Salford
Approved on 21 January 2015
Council decision: ApproveDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Display of five non illuminated directional signs to Dukes Manor new development site, on various lamp posts.
- Received
- 13 November 2014
- Decision level
- Delegated (officer decision)
- Council
- Salford City Council
- Ward
- Walkden South
- ReceivedReceived13 Nov
- ValidatedValidated27 Nov
- Consult.Consultation22 Dec
- TargetTarget Date22 Jan
- DecidedDecided21 Jan
Decided in 55 days (council typically 56)
About this application
This is an advertising consent application at Lamp Posts On Bolton Road - Bridgewater Road, Manchester Road East - Hilton Lane, Ellesmere Street - Hilton Lane, Walkden Road - Park Road And Bridgewater Road - Hilton Lane Salford. Salford has handled 221 applications of this type. This one was decided in 69 days, 13 days longer than Salford's typical decision time. There are no previous applications recorded at this address.
85% of advertising applications at Salford City Council were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Advert Application
- Scale / size
- Small
Planning application dates
- Date validated
- 27 November 2014
- Consultation expiry
- 22 December 2014
- Consultation start
- 1 December 2014
- Consultation end
- 22 December 2014
- Last date for comments
- 22 December 2014
- Target decision date
- 22 January 2015
- Permission expires
- 21 January 2020
Applicant and agent
- Agent
- Sign Build
- Agent address
- A126 Tustin Way Preston Lancashire PR2 5LX
Planning decision
- Statutory period
- 56 days
Site constraints
Designations that overlap or adjoin the site outline.
- Article 4 direction: 2024 HMO Article 4 Direction
- Brownfield land register: 9 To 11 Bolton Road, Worsley, M28 3AXRegister site at or near this address · +1 more
- Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves and heritage coasts.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: Salford
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- The Gill Medical Centre 5 Harriet Street Worsley M28 3DR08/56528/FUL · FullApproved0.0 mi
- Vacant Land at Campbell Way, WalkdenPA/2026/0021 · AdvertisingWithdrawn0.0 mi
- Land West of Stocks Hotel, Corner of Bolton Road and Manchester Road, Salford, M28 3DROTH/2026/0002 · ConditionsApproved0.0 mi
- Land West of Stocks Hotel, Corner of Bolton Road and Manchester Road, Salford, M28 3DROTH/2025/1675 · ConditionsApproved0.0 mi
- Land West of Stocks Hotel , Corner of Bolton Road and Manchester Road, Walkden, Salford, M28 3DROTH/2025/1534 · ConditionsApproved0.0 mi
For applicants and trades
Contractors near this project
- Undisputed Waste ServicesVerifiedManchesterHouse clearanceGarage clearance7.3 mi
- BDF ElectricalElectrician0.1 mi
- A B S ElectricsElectrician0.1 mi
- All Eco Energy Solutions LimitedPlumber & Heating EngineerElectrician0.1 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.