Skip to content

Land Off Walshaw Drive Swinton M27 5PN

09/57818/FULFull applicationApproved
Full

Approved on 7 December 2009

Council decision: ApproveDelegated (officer decision)

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Erection of two detached dwellings

Received
19 June 2009
Decision level
Delegated (officer decision)
Ward
Swinton South
Agent
Mattin MacLean Ltd
  1. Received19 Jun
  2. Validated5 Aug
  3. Consult.20 Aug
  4. Target30 Sep
  5. Decided7 Dec

Decided in 124 days (council typically 56)

About this application

This is a full planning application at Land Off Walshaw Drive Swinton M27 5PN. Salford has handled 2,261 applications of this type. This one was decided in 171 days, 16 weeks longer than Salford's typical decision time. There has been 1 other application at this address. We hold 1,245 applications in total for the M27 postcode area.

88% of full applications at Salford City Council were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Postcode
M27 5PN
Application type
Full application
Scale / size
Small

Planning application dates

Date validated
5 August 2009
Consultation expiry
20 August 2009
Consultation start
30 July 2009
Consultation end
20 August 2009
Neighbour consultation start
5 August 2009
Neighbour consultation end
15 August 2009
Last date for comments
7 September 2009
Target decision date
30 September 2009
Permission expires
7 December 2014

Applicant and agent

Agent
Mattin MacLean Ltd
Agent address
1 Market Street Whaley Bridge High Peak SK23 7AA

Planning decision

Statutory period
56 days

Additional information

Comments
0
Documents
25
Constraints
1

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Article 4 direction: 2024 HMO Article 4 Direction
  • Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (23)

flood storage areas, conservation areas, listed buildings, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Salford

Track this application

Get email alerts when there is a planning decision or status change.

Get email alerts near M27

New planning applications delivered to your inbox daily.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused for new homes on your street. Pick your home and get the evidence before you pay for drawings.