Skip to content

Barn Adjacent Silentnight Earby Road Salterforth Lancashire

13/11/0211PExtension of time on extant permissionApproved
Discharge / amendments

Approved on 7 July 2011

Council decision: Approved with ConditionsPlanning committee

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Full: Extension of Time: Extend time limit for implementation of Planning Permission 13/08/0139P (Change of Use of former industrial building to five dwellings, with additional openings).

Received
26 April 2011
Decision level
Planning committee
Ward
Earby
  1. Received26 Apr
  2. Validated26 Apr
  3. Consult.
  4. Target21 Jun
  5. Decided7 Jul

Decided in 72 days (council typically 49)

About this application

This is an application to amend a permission at Barn Adjacent Silentnight Earby Road Salterforth Lancashire. Pendle has handled 84 applications of this type. This one was decided in 72 days, 3 weeks longer than Pendle's typical decision time. The site is in 1 listed building nearby. There have been 2 other applications at this address.

88% of amendment applications at Pendle Borough Council were approved. Across all application types, the council typically decides in about 7 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Extension of time on extant permission
Scale / size
Small
Parish
Salterforth Parish Council

Planning application dates

Date validated
26 April 2011
Target decision date
21 June 2011
Permission expires
7 July 2014

Applicant and agent

Agent address
Fao: Mr M Hughes Brandon House King Street Knutsford Cheshire WA16 6DX

Planning decision

Statutory period
56 days

Additional information

Comments
0
Documents
28
Constraints
2

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Brownfield land register: Salterforth Mill, Earby Road, SalterforthRegister site at or near this address
  • Flood zone 1: Low probability (rivers and sea)

Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.

Also checked, none recorded (21)

flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves and heritage coasts.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Associated applications

  1. 2011
    26 Apr

    Full: Extension of Time: Extend time limit for implementation of Planning Permission 13/08/0139P

    This applicationApprovedAmendment13/11/0211P
  2. 2008
    3 Mar

    Full: Change of use of former industrial building to form five dwellings with additional openings.

    ApprovedFull ApplicationPart of13/08/0139P

Source: Pendle

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.