Greenside Farm Lower Elkstones Warslow
Approved on 16 April 2024
Council decision: Granted ConditionallyDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Removal of part front elevation, rebuilding like for like. Removal of existing single storey lean to and rebuilding an upward extension. Building a new 2 storey side extension along with minor internal works. And the demolition of existing pigsty and W.C to be replaced with Plant Room, Laundry and W.C.'
- Submitted
- 22 November 2023
- Decision level
- Delegated (officer decision)
- Council
- Peak District
- ReceivedSubmitted22 Nov
- ValidatedValidated22 Nov
- Consult.Consultation29 Dec
- TargetTarget Date19 Apr
- DecidedDecided16 Apr
Decided in 146 days (council typically 49)
About this application
This is a full planning application for demolition at GREENSIDE FARM LOWER ELKSTONES WARSLOW. Peak District has handled 1,581 applications of this type. This one was decided in 146 days, 14 weeks longer than Peak District's typical decision time. There are no previous applications recorded at this address.
86% of full applications at Peak District were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Full Planning Permission
- Scale / size
- Medium
- Parish
- Warslow and Elkstones
Planning application dates
- Date validated
- 22 November 2023
- Consultation expiry
- 29 December 2023
- Consultation end
- 29 December 2023
- Target decision date
- 19 April 2024
Applicant and agent
- Agent
- Andrew Humphries RIBA
- Agent address
- Aldern House Baslow Road Bakewell Derbyshire DE45 1AE
Planning decision
- Statutory period
- 149 days
Site constraints
Designations that overlap or adjoin the site outline.
- National park: Peak District
- SSSI: Leek Moors SSSIPart of the site
- Special Area of Conservation: South Pennine MoorsPart of the site
- Special Protection Area: Peak District Moors (South Pennine Moors Phase 1)Part of the site
- Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (20)
flood storage areas, conservation areas, listed buildings, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, National Landscapes, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: Peak District
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- SPRING BANK BACK LANE WARSLOW BUXTON SK17 0JRNP/TCA/0525/0443 · TreesApproved0.6 mi
- MANIFOLD VIEW BACK LANE WARSLOWNP/SM/0326/0280 · FullAwaiting decision0.8 mi
- PUMP FARM SCHOOL LANE WARSLOWNP/NMA/0225/0104 · AmendmentApproved0.8 mi
- NEVA COTTAGE ONECOTE ROAD WARSLOW STAFFORDSHIRE SK17 0JHNP/TCA/1124/1294 · TreesApproved0.9 mi
- Overdale , Elkstones , Longnor , Staffordshire , SK17 0LUCON/2025/0021 · OutlineAwaiting decision1.1 mi
For applicants and trades
Contractors near this project
- P.A.B Electrical LtdElectrician1.9 mi
- Gems UK LtdElectrician2.6 mi
- Hamps Valley LtdTree Surgeons2.7 mi
- Clay Projects LtdSolid Fuel Heating4.3 mi
Planning something similar?
See what the council approved and refused for two-storey and first-floor extensions on your street. Pick your home and get the evidence before you pay for drawings.