Skip to content

Hafod Bach Pinfold Hill Curbar

NP/DDD/0426/0437Full Planning PermissionAwaiting decision
Full
Approximate location: the centre of the postcode, not the exact property.

Proposal

Raising roof of existing dwelling, replacement windows & doors, new garden shed and alterations to existing entrance.

Submitted
5 May 2026
Decision due
30 June 2026
Council
Peak District
Agent
Richard Mundy Building Design Ltd
  1. Received5 May
  2. Validated5 May
  3. Consult.8 Jun
  4. Target30 Jun
  5. Decided

Have your say

Comments close on 8 June.

About this application

This is a full planning application for window replacement at HAFOD BACH PINFOLD HILL CURBAR. Peak District has handled 1,581 applications of this type. It has been with the council since 5 May 2026 and is still awaiting a decision. The site is in the Curbar (No. 2) conservation area, with 3 listed buildings nearby. There are no previous applications recorded at this address.

86% of full applications at Peak District were approved. Across all application types, the council typically decides in about 7 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Full Planning Permission
Scale / size
Small
Parish
Curbar

Planning application dates

Date validated
5 May 2026
Consultation expiry
8 June 2026
Consultation end
8 June 2026

Applicant and agent

Agent
Richard Mundy Building Design Ltd
Agent address
Travel House Buxton Road BAKEWELL Derbyshire DE45 1BZ

Planning decision

Statutory period
56 days

Additional information

Planning Portal ID
PP-14896767

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations at the address point. Ones next to the site may also apply.

  • Conservation area: Curbar (No.2)
  • National park: Peak District
  • Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (22)

flood storage areas, listed buildings, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Peak District

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused for loft conversions and dormers on your street. Pick your home and get the evidence before you pay for drawings.