EN0110014Planning Application EN0110014
Planning application at The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton., NSIP England. View planning documents, track the decision and get email alerts on updates.
East Pye Solar
EN0110014
The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.
This is a planning application for a solar installation at The project is proposed as being built across multiple sites approximately 1,100 hectares (2,718 acres) in area, located south of Norwich and north of Harleston. The solar sites are concentrated east of Long Stratton, with an additional cluster located south of Great Moulton, approximately 6.5km to the southwest of the solar sites around Long Stratton.. NSIP England has handled 20 applications of this type and approves nearly all of them, typically deciding them in 478 days. It was submitted on 5 March 2026 and is still awaiting a decision. There are no previous applications recorded at this address.
Track this application
Get email alerts when there is a planning decision or status change.
Application Details
Applicant & Agent
Planning Application Dates
Planning Decision
Publicity
Appeal
Additional Information
Source: NSIP England