10-16 Camp Hill Road Nuneaton CV10 0 JH
Approved on 22 June 2021
Council decision: Granted Subject to ConditionsDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Change of use of 16 Camp Hill Road from residential into use class E (Clinic / health centre), elevation changes to front and alterations to 10-14 Camp Hill Road and car park works
- Received
- 19 April 2021
- Decision level
- Delegated (officer decision)
- Ward
- Hartshill
- Agent
- Design Adapt And Build Ltd
- ReceivedReceived19 Apr
- ValidatedValidated19 Apr
- Consult.Consultation7 Jun
- TargetTarget Date
- DecidedDecided22 Jun
Decided in 64 days (council typically 70)
About this application
This is a full planning application for a change of use at 10-16 Camp Hill Road Nuneaton CV10 0 JH. North Warwickshire has handled 165 applications of this type. This one was decided in 64 days, 6 days quicker than North Warwickshire's typical decision time. There are no previous applications recorded at this address. In the past year there have been 8 applications across Hartshill.
98% of full applications at North Warwickshire Borough Council were approved. Across all application types, the council typically decides in about 10 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Full Planning Application
- Scale / size
- Small
- Parish
- Hartshill
Planning application dates
- Date validated
- 19 April 2021
- Consultation expiry
- 7 June 2021
- Consultation start
- 14 May 2021
- Consultation end
- 7 June 2021
- Application expires
- 14 June 2021
Applicant and agent
- Agent
- Design Adapt And Build Ltd
- Architect profile
- DESIGN ADAPT & BUILD LTD
Planning decision
- Statutory period
- 56 days
Additional information
- Documents
- 9
Site constraints
Designations that overlap or adjoin the site outline.
- Article 4 direction: Borough widePart of the site
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: tree preservation orders. Ask the council if these matter.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: North Warwickshire
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- Lloyds Pharmacy Store 4 Camp Hill Road Hartshill NuneatonPAP/2006/0242Approved0.0 mi
- The Stable Cottage Camp Hill Road Nuneaton CV10 0JHPAP/2025/0546Approved0.0 mi
- The Stable Cottage Camp Hill Road Nuneaton CV10 0JHPAP/2025/0255Approved0.0 mi
- Snowhill Recreation Ground Victoria Road Hartshill Warwickshire CV10 OLSPAP/2009/0014Approved0.0 mi
- Aki's Fish Bar 5 Victoria Road Hartshill Warwickshire CV10 0LSPAP/2011/0179Approved0.0 mi
For applicants and trades
Contractors near this project
- Prime Electrical Services LtdElectrician0.3 mi
- JCW Electrical Installations LtdElectrician0.3 mi
- R.A Deeming ElectricalElectrician0.4 mi
- J M Electrical SolutionsElectrician0.5 mi