Street Known As Walton Park North Shields Tyne And Wear

08/00880/TPOtree preservation order tree worksDecided

Decided on 12 June 2008

Council decision: Split DecisionDelegated (officer decision)

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Works to Sycamore trees within G1 of The Tynemouth (Foots Buildings, Preston) TPO 1969 - 1) Tree at entrance - Branch dead, needs to be removed. 2) Trees overhanging numerous garages in street require clipping. 3) One tree at hammer-head is leaning forward and will continue to grow in that way. Tree surgeon states removal required. The Tynemouth (Foots Buildings, Preston) TPO 1969

Received
18 March 2008
Decision level
Delegated (officer decision)
Ward
Preston
  1. Received18 Mar
  2. Validated10 Apr
  3. Consult.5 May
  4. Target29 May
  5. Decided12 Jun

Decided in 63 days (council typically 49)

About this application

This is a tree application at Street Known As Walton Park North Shields Tyne And Wear. North Tyneside has handled 315 applications of this type. There are no previous applications recorded at this address.

94% of trees applications at North Tyneside Metropolitan Borough Council were approved. Across all application types, the council typically decides in about 7 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
tree preservation order tree works
Scale / size
Small
Parish
North Shields

Planning application dates

Date validated
10 April 2008
Consultation expiry
5 May 2008
Consultation start
14 April 2008
Consultation end
5 May 2008
Last date for comments
5 May 2008
Target decision date
29 May 2008

Planning decision

Statutory period
49 days

Additional information

Comments
0
Documents
4

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Tree Preservation Order: 16/00003/TPOPart of the site
  • Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (23)

flood storage areas, conservation areas, listed buildings, Article 4 directions, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: North Tyneside

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.