Pine Ridge, Hill Top, Beaulieu, Brockenhurst, SO42 7YR
Approved on 1 November 2021
Council decision: Grant Subject to ConditionsDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Replacement dwelling; outbuilding; associated landscaping and replacement boundary treatments; demolition of existing dwelling and outbuildings
- Received
- 1 September 2021
- Decision level
- Delegated (officer decision)
- Council
- New Forest (Park)
- Agent
- AR Design Studio
- ReceivedReceived1 Sep
- ValidatedValidated1 Sep
- Consult.Consultation
- TargetTarget Date27 Oct
- DecidedDecided1 Nov
Decided in 61 days (council typically 35)
About this application
This is a full planning application for demolition at PINE RIDGE, HILL TOP, BEAULIEU, BROCKENHURST, SO42 7YR. New Forest (Park) has handled 1,252 applications of this type. This one was decided in 61 days, 4 weeks longer than New Forest (Park)'s typical decision time. There are no previous applications recorded at this address. We hold 307 applications in total for the SO42 postcode area.
93% of full applications at New Forest (Park) were approved. Across all application types, the council typically decides in about 5 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- SO42 7YR
- Application type
- Full Application
- Development type
- Storage-warehousing
- Scale / size
- Medium
- Parish
- Beaulieu Parish Council, Denny Lodge Parish Council
Planning application dates
- Date validated
- 1 September 2021
- Target decision date
- 27 October 2021
- Application expires
- 1 November 2021
Applicant and agent
- Agent
- AR Design Studio
- Architect profile
- AR DESIGN STUDIO LTD
Planning decision
- Statutory period
- 61 days
Site constraints
Designations that overlap or adjoin the site outline.
- Article 4 direction: Article 4 Direction Np New Forest Campsite+2 more
- Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Wat…Applies to new homes and overnight accommodation
- National park: New Forest
- SSSI: The New Forest SSSIPart of the site
- Special Area of Conservation: The New ForestPart of the site
- Special Protection Area: New ForestPart of the site
- Ramsar wetland: New ForestPart of the site
- Flood zone 1: Low probability (rivers and sea)
Also checked, none recorded (17)
flood storage areas, conservation areas, listed buildings, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, National Landscapes, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: New Forest (Park)
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near SO42
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Hilltop House, PALACE LANE, BEAULIEU, BROCKENHURST, SO42 7YG25/00006DOC · ConditionsApproved0.8 mi
- Hilltop House, PALACE LANE, BEAULIEU, BROCKENHURST, SO42 7YG24/01491DOC · ConditionsApproved0.8 mi
- Events Field, Beaulieu, Hampshire, SO42 7ZN23/00189CAC · FullApproved1.0 mi
- Field West of Treehouse Study Centre, Hartford Wood, Beaulieu, SO42 7YL25/01405FULL · FullAwaiting decision1.0 mi
- Home Farm, PALACE LANE, BEAULIEU, BROCKENHURST, SO42 7YG23/00661DOC · ConditionsApproved1.2 mi
For applicants and trades
Contractors near this project
Find contractors for landscaping & driveways near this site- Forest Homes Development LtdWindow & Door Installer1.4 mi
- Waterside Electrical ServicesElectrician1.4 mi
- AES Property CareBathroom Design & InstallationBuilding Contractors1.5 mi
- Lambertlux Electrical SolutionsElectrician1.7 mi
Planning something similar?
See what the council approved and refused for replacement homes on your street. Pick your home and get the evidence before you pay for drawings.