Skip to content

Land at Low Grange Farm South Bank

26/0152/RCONRedcar and Cleveland ConsultationPending Decision
Reserved matters

Proposal

Application for reserved matters approval (access, appearance, landscaping, layout and scale) following Outline Planning Permission R/2014/0372/OOM for 165 dwellings with associated landscaping, bund and ancillary works

Received
31 March 2026
Target decision date
12 May 2026
Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

  1. Received31 Mar
  2. Validated1 Apr
  3. Consult.
  4. Target12 May
  5. Decided
8 weeks typical decision time in Middlesbrough94% of outline applications approved

This is an outline application at Land at Low Grange Farm South Bank. Middlesbrough has handled 119 applications of this type and approves 94% of them, typically deciding them in 44 days. It was submitted on 31 March 2026 and is still awaiting a decision. The site is in 1 listed building nearby. There are no previous applications recorded at this address.

Application Details

Reference
26/0152/RCON
Address
Land at Low Grange Farm South Bank
Local Authority
Middlesbrough
Application Type
Redcar and Cleveland Consultation
Scale / Size
Large
Number of Dwellings
165
Decision Status
Undecided
Current Status
Decision Issued

Applicant & Agent

Planning Application Dates

Date Received
31 March 2026
Target Decision Date
12 May 2026
Date Validated
1 April 2026
Date Submitted
31 March 2026
Application Expires
22 April 2026
Decision Issued
30 April 2026

Planning Decision

Decision
No Objections
Statutory Period
41 days

Publicity

Appeal

Additional Information

UPRN
MAN000000000017338
Documents
1
Coordinates
54.538685, -1.201680
Enriching application data
2/3
Council recordsAppealsFlood risk

Source: Middlesbrough

Track this application

Get email alerts when there is a planning decision or status change.

Planning constraints

Designations that overlap or adjoin the site outline.

Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.

Also checked, none recorded (19)

flood storage areas, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-10-09. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

What's been approved on your street?

See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.

Get The Signal Report