Land at NGR 276618 103067 A377/Bishops Drive Copplestone Devon
Withdrawn on 3 February 2025
Council decision: ClosedDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Application to cut back by 1m branches of 2 Rowan, group of Ash, Sorbus and Hazel cut back by 3m 1 Hazel, Hawthorn, Oak and Elm and Remove 1 Elm tree protected by Tree Preservation Order 97/00009/TPO - TREES NOT PROTECTED BY 97/00009/TPO
- Received
- 11 December 2024
- Decision level
- Delegated (officer decision)
- Council
- Mid Devon District Council
- Ward
- Upper Yeo and Taw
- ReceivedReceived11 Dec
- ValidatedValidated11 Dec
- Consult.Consultation1 Jan
- TargetTarget Date5 Feb
- DecidedDecided3 Feb
Decided in 54 days (council typically 56)
About this application
This is a tree application at Land at NGR 276618 103067 A377/Bishops Drive Copplestone Devon. Mid Devon has handled 527 applications of this type. It was withdrawn 54 days after it was submitted, before a decision was made. The site is in a conservation area, with 1 listed building nearby. There are no previous applications recorded at this address. In the past year there have been 15 applications across Upper Yeo and Taw.
99% of trees applications at Mid Devon District Council were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.See what's approved near your address
Application details
- Application type
- Works to TPO Trees
- Scale / size
- Small
- Parish
- Copplestone 62
Planning application dates
- Date validated
- 11 December 2024
- Consultation expiry
- 1 January 2025
- Consultation start
- 11 December 2024
- Neighbour consultation end
- 1 January 2025
- Last date for comments
- 1 January 2025
- Target decision date
- 5 February 2025
- Permission expires
- 3 February 2027
Applicant and agent
- Agent address
- Hardy Tree Surgeons Ltd Unit 1 Charminster Farm Industrial Wanchard Lane Charminster DT2 9RP
Planning decision
- Statutory period
- 56 days
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: conservation areas, Article 4 directions and tree preservation orders. Ask the council if these matter.
Also checked, none recorded (21)
flood storage areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: Mid Devon
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- 2 Sharphays Copplestone Crediton Devon EX17 5LF26/00064/PNHH · FullApproved0.2 mi
- Victoria Cottage Copplestone Crediton Devon EX17 5NG26/01043/HOUSE · FullApproved0.3 mi
- Stanhope Copplestone Crediton Devon EX17 5NX26/00232/HOUSE · FullApproved0.4 mi
- Car Park Fernworthy Park Copplestone Devon25/00147/FULL · FullApproved0.4 mi
- Waterbridge House Copplestone Crediton Devon EX17 5LF25/01671/HOUSE · FullApproved0.5 mi
For applicants and trades
Contractors near this project
- Goodwin Electrical SolutionsElectrician0.0 mi
- A H Gilbert & SonElectrician2.0 mi
- Red Deer ElectricalElectrician3.8 mi
- A & J Electrical Engineering LTDElectrician4.1 mi
What's been approved on your street?
See what the council approved and refused near this address for the project you have in mind, and the rules that apply here.
Get The Signal Report