Mooring Right Bank Adjacent Bridge House Waterside Upton Upon Severn

M/26/00060/FULFull planning permissionRefused
Full

Refused on 14 April 2026

Council decision: RefusalDelegated (officer decision)3 reasons for refusal

Approximate location: the centre of the postcode, not the exact property.

Proposal

Replacement pontoon (retrospective)

Received
15 January 2026
Decision level
Delegated (officer decision)
Ward
Upton & Ripple Ward
  1. Received15 Jan
  2. Validated17 Feb
  3. Consult.20 Mar
  4. Target
  5. Decided14 Apr

Decided in 56 days (council typically 56)

About this application

This is a full planning application at Mooring Right Bank Adjacent Bridge House Waterside Upton Upon Severn. Malvern Hills has handled 1,246 applications of this type. This one was decided in 89 days, 5 weeks longer than Malvern Hills's typical decision time. The site is in a conservation area, with 1 listed building nearby. There are no previous applications recorded at this address. In the past year there have been 55 applications across Upton & Ripple Ward.

90% of full applications at Malvern Hills District Council were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Why it was refused

  1. The development is situated outside of any defined development boundary where development is strictly controlled subject to other Policies in the Development Plan. In this instance the development is contrary to Policy SWDPR 52 of the South Worcestershire Development Plan Review as it fails to meet with criterion (i), (vi) and (vii) by reason that the enlarged mooring has failed to have reasonable regard to all potential users of the waterway and has resulted in conflicting uses with other moorings being inaccessible as a result of its size, adversely affecting the amenity of a waterway. Furthermore, the information submitted with the application is deficient in terms of details to demonstrate that the number and capacity of existing provision can accommodate the increase proposed, the impact on landscape and provision for safe access. It is therefore an unacceptable form of development within the open countryside contrary to Policies SWDPR 03 and SWDPR 52 of the South Worcestershire Development Plan Review.
  2. The pontoon is of a size and materials which fails to respect the character of the area and its unbalanced design results in a visual intrusion, due to the mass of concrete negatively contrasting with the surrounding natural riverside environment. The pontoon adversely affects the character and appearance of the conservation area, as well as the setting of three Grade II listed buildings (The Swan Inn (H.E. Ref: 1227324), Bridge House (H.E. Ref: 1265404), and The King’s Head (H.E. Ref: 1227322)) in close proximity to the site, resulting in a moderate level of harm to heritage assets. The development is therefore contrary to Policies SWDPR 05, SWDPR 09, SWDPR 28 and SWDPR 33 of the SWDPR and also contrary to paragraphs 210-215 of the National Planning Policy Framework.
  3. The site is located within Flood Zone 3b and forms part of the functional flood plain; however the applicant has failed to provide a suitable Flood Risk Assessment or a Flood Evacuation Plan as required by policies SWDPR 38. In particular, the submitted FRA is deficient in respect of information pertaining to the Design Flood Level for the site and how the proposed pontoon will behave during a design flood event. Furthermore it has not been adequately demonstrated how the development will remain operational and safe for users in times of flood, result in no net loss of floodplain storage and not impede water flows and not increase flood risk elsewhere. The application has also failed to demonstrate that the integrity of the flood defence has not been affected or compromised as a result of the works. Finally, no Flood Warning and Evacuation Plan has been submitted which identifies a flood level that will initiate evacuation of people, and any subsequent closure of the facility. Overall, the applicant has failed to demonstrate that the development would not have an adverse impact on the functional floodplain and that safe access can be provided in the event of a flood. Consequently, the development is considered to result in an increase in flood risk to the area and an unacceptable risk to life for future users of the development contrary to Policy SWDPR 38 of the South Worcestershire Development Plan Review as well as being contrary to paragraphs 170 and 175 of the NPPF and also contrary to the guidance set out within paragraphs 044, 047 and 048 of the NPPG.

From the council's decision notice.

Application details

Application type
Full planning permission
Scale / size
Small
Parish
Upton-upon-Severn CP

Planning application dates

Date validated
17 February 2026
Consultation expiry
20 March 2026
Consultation start
19 February 2026
Consultation end
20 March 2026

Applicant and agent

Agent address
Open Space Business Centre Chequers Close Enigma Park Malvern Worcestershire WR14 1GP

Publicity

Advertisement expiry
20 March 2026

Additional information

Documents
46

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations at the address point. Ones next to the site may also apply.

  • Flood zone 1: Low probability (rivers and sea)

Not published by this council, so not checked: conservation areas, Article 4 directions and tree preservation orders. Ask the council if these matter.

Also checked, none recorded (21)

flood storage areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Malvern Hills

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.