92 Allington Road Newick East Sussex BN8 4ND
Withdrawn on 19 July 2018
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Erection of a pair of semi-detached cottages
- Received
- 1 May 2018
- Public comments
- 2
- Council
- Lewes District Council
- Ward
- Newick
- Agent
- Lewis and Co Planning SE Ltd
- ReceivedReceived1 May
- ValidatedValidated4 May
- Consult.Consultation6 Jun
- TargetTarget Date27 Jul
- DecidedDecided19 Jul
Decided in 76 days (council typically 56)
About this application
This is a full planning application at 92 Allington Road Newick East Sussex BN8 4ND. Lewes has handled 2,780 applications of this type. It was withdrawn 79 days after it was submitted, before a decision was made. There have been 5 other applications at this address. In the past year there have been 30 applications across Newick. We hold 1,970 applications in total for the BN8 postcode area.
92% of full applications at Lewes District Council were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- BN8 4ND
- Application type
- Planning Application
- Scale / size
- Medium
- Parish
- Newick
Planning application dates
- Date validated
- 4 May 2018
- Consultation expiry
- 15 June 2018
- Consultation start
- 9 May 2018
- Consultation end
- 6 June 2018
- Neighbour consultation start
- 9 May 2018
- Neighbour consultation end
- 6 June 2018
- Last date for comments
- 28 July 2018
- Target decision date
- 27 July 2018
Applicant and agent
- Agent
- Lewis and Co Planning SE Ltd
- Agent address
- Lewis & Co Planning 2 Port Hall Road Brighton BN1 5PD
Planning decision
- Statutory period
- 84 days
Publicity
- Site notice start
- 25 May 2018
- Site notice end
- 15 June 2018
Additional information
- Planning Portal ID
- PP-06937692
- Documents
- 12
- Constraints
- 28
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
5 other applications at this property, newest first.
- 202627 Apr
Non-material amendment relating to approval LW/19/0911
ApprovedNon-material amendmentLW/26/0226 - 20226 Apr
Discharge of condition 3 (external materials), 4 (hard and soft landscape works), and 5 (boundary treatments)…
ApprovedDischarge of conditionsLW/22/0237/CD - 202214 Mar
2 storey rear extension
ApprovedHouseholderLW/22/0186 - 201920 Dec
Creation of detached dwelling, extension to existing dwelling and associated parking
RefusedPlanning ApplicationLW/19/0911 - 20191 Mar
Extension of existing dwelling, division of enlarged dwelling into two dwellings, and erection of detached…
RefusedPlanning ApplicationLW/19/0164
Source: Lewes
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near BN8
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- 92 Allington Road Newick East Sussex BN8 4NDLW/19/0164 · FullRefused0.0 mi
- 92 Allington Road Newick East Sussex BN8 4NDLW/26/0226 · AmendmentApproved0.0 mi
- 92 Allington Road Newick East Sussex BN8 4NDLW/22/0237/CD · ConditionsApproved0.0 mi
- 92 Allington Road Newick East Sussex BN8 4NDLW/19/0911 · FullRefused0.0 mi
- 92 Allington Road Newick East Sussex BN8 4NDLW/22/0186 · FullApproved0.0 mi
For applicants and trades
Contractors near this project
Find contractors for new builds near this site- Duncton Electrical ContractorsCommercial & industrial electrical installationsElectrical Installations within Dwellings (Part P)0.2 mi
- JR White ElectricalElectrician0.3 mi
- Haider ElectricalElectrician1.6 mi
- Cornerstone Roofing LtdRooferRoofers2.7 mi
Planning something similar?
See what the council approved and refused for new homes on your street. Pick your home and get the evidence before you pay for drawings.