Skaters Roller Rink Ratten Row Walpole Highway Norfolk PE14 7QH
Refused on 17 August 2018
Council decision: Application RefusedDelegated (officer decision)
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Outline Application: Construction of 1 dwelling
- Received
- 4 June 2018
- Decision level
- Delegated (officer decision)
- Public comments
- 3
- Ward
- Walton
- ReceivedReceived4 Jun
- ValidatedValidated19 Jun
- Consult.Consultation11 Jul
- TargetTarget Date14 Aug
- DecidedDecided17 Aug
Decided in 59 days (council typically 49)
About this application
This is an outline application at Skaters Roller Rink Ratten Row Walpole Highway Norfolk PE14 7QH. Kings Lynn has handled 937 applications of this type. This one was decided in 74 days, 4 weeks longer than Kings Lynn's typical decision time. There have been 3 other applications at this address. We hold 1,698 applications in total for the PE14 postcode area.
73% of outline applications at King's Lynn and West Norfolk Borough Council were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- PE14 7QH
- Application type
- Outline Application
- Scale / size
- Small
- Parish
- Walpole Highway
Planning application dates
- Date validated
- 19 June 2018
- Consultation expiry
- 18 July 2018
- Consultation start
- 20 June 2018
- Consultation end
- 11 July 2018
- Neighbour consultation start
- 20 June 2018
- Neighbour consultation end
- 11 July 2018
- Last date for comments
- 18 July 2018
- Target decision date
- 14 August 2018
Applicant and agent
- Agent address
- Salgate Barn Islington Road Tilney All Saints King's Lynn Norfolk PE34 4RY
Planning decision
- Statutory period
- 56 days
Publicity
- Site notice start
- 27 June 2018
- Site notice end
- 18 July 2018
Additional information
- Planning Portal ID
- PP-07020271
- Documents
- 18
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 3: High probability (rivers and sea)Part of the site
Also checked, none recorded (24)
flood storage areas, conservation areas, listed buildings, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Associated applications
- 20184 Jun
Outline Application: Construction of 1 dwelling
This applicationRefusedOutline18/01011/O - 201829 May
Change of use from Fenland Motorcycle training area to overflow car park for skaters and use of existing…
ApprovedChange of Use ApplicationFiled alongside18/00972/CU
Planning history at this site
4 other applications at this property, newest first.
- 201819 Oct
DISCHARGE OF CONDITION 3: Proposed 1No residential dwelling within Skaters existing access
Discharge of Condition final letterDischarge of conditions18/00819/DISC_A - 20184 May
Proposed 1No residential dwelling within Skaters existing access
ApprovedFull Application18/00819/F - 200820 Nov
Alterations to existing roller skating rink
ApprovedFull Application08/02625/F - 200728 Sep
Construction of 22 houses (including 7 affordable homes) involving the demolition of skaters and other…
WithdrawnFull Application - Major Development07/02068/FM
Source: Kings Lynn
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near PE14
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Raft N Alf Ratten Row Walpole Highway Wisbech Norfolk PE14 7QH15/01266/F · FullApproved0.0 mi
- Endycott Ratten Row Walpole Highway Wisbech Norfolk PE14 7QH19/00807/F · FullApproved0.0 mi
- Land South Of Its Me Ratten Row Walpole Highway Wisbech Norfolk PE14 7QH07/01942/F · FullApproved0.0 mi
- Land North Of 1 Ratten Row Walpole Highway Norfolk09/01224/F · FullWithdrawn0.0 mi
- Land North of 1 Ratten Row Walpole Highway Norfolk09/01752/NMA_1 · AmendmentApproved0.0 mi
For applicants and trades
Contractors near this project
- EE ElectricalElectrician1.4 mi
- ADB Electrical LtdElectricianSolar Panel Installer1.4 mi
- Jack Byron Electrical LtdElectrician1.5 mi
- Anglian Solar LtdElectrician1.6 mi
Planning something similar?
See what the council approved and refused for new homes on your street. Pick your home and get the evidence before you pay for drawings.