Land At Townsend Farm Church Road Walpole St Peter Walpole Norfolk
Approved on 15 June 2006
Council decision: Application PermittedPlanning committee
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
Proposal
Construction of 15 dwellings after demolition of existing buildings
- Received
- 19 January 2005
- Decision level
- Planning committee
- Ward
- Walpole
- ReceivedReceived19 Jan
- ValidatedValidated2 Feb
- Consult.Consultation23 Feb
- TargetTarget Date3 May
- DecidedDecided15 Jun
Decided in 498 days (council typically 49)
About this application
This is a full planning application for demolition at Land At Townsend Farm Church Road Walpole St Peter Walpole Norfolk. Kings Lynn has handled 4,002 applications of this type. This one was decided in 512 days, 66 weeks longer than Kings Lynn's typical decision time. The site is in 1 listed building nearby. There are no previous applications recorded at this address.
90% of full applications at King's Lynn and West Norfolk Borough Council were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Full Application - Major Development
- Scale / size
- Large
- Number of dwellings
- 15
- Parish
- Walpole
Planning application dates
- Date validated
- 2 February 2005
- Consultation expiry
- 23 February 2006
- Consultation start
- 2 February 2005
- Consultation end
- 23 February 2005
- Neighbour consultation start
- 2 February 2006
- Neighbour consultation end
- 23 February 2006
- Last date for comments
- 7 July 2006
- Target decision date
- 3 May 2005
- Committee meeting
- 5 December 2005
- Application expires
- 30 March 2005
Applicant and agent
- Agent address
- 48 St Ives Road Hemingford Grey Cambridgeshire PE28 9DX
Planning decision
- Statutory period
- 90 days
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 3: High probability (rivers and sea)Part of the site
Also checked, none recorded (24)
flood storage areas, conservation areas, listed buildings, Article 4 directions, tree preservation orders, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Associated applications
- 201222 Oct
NON-MATERIAL AMENDMENT TO PLANNING CONSENT 11/01575/F
ApprovedNon-material amendmentAmendment11/01575/NMA_1 - 201114 Sep
Construction of two dwellings (amendment to planning permission 05/00107/F
ApprovedFull ApplicationRelated11/01575/F - 201130 Mar
Construction of terrace of 3 dwellings (amendment to planning permission 05/00107/F
RefusedFull ApplicationRelated11/00531/F - 200519 Jan
Construction of 15 dwellings after demolition of existing buildings
This applicationApprovedFull05/00107/F
Planning history at this site
2 other applications at this property, newest first.
Source: Kings Lynn
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- Townsend Farm Church Road Walpole St Peter Walpole2/04/0391/F · FullWithdrawn0.0 mi
- Land At Townsend Farm Church Road Walpole St Andrew Norfolk07/00221/F · FullApproved0.0 mi
- Townsend Farm Church Road Walpole St Andrew Norfolk07/00820/F · FullApproved0.0 mi
- Land At Townsend Farm Church Road Walpole St Peter Norfolk PE14 7NS11/00531/F · FullRefused0.0 mi
- Land At Townsend Farm Church Road Walpole St Peter Norfolk PE14 7NS11/01575/NMA_1 · AmendmentApproved0.0 mi
For applicants and trades
Contractors near this project
- R J F Electrical Contractors LtdElectrician0.7 mi
- Irvines Plumbing & HeatingSolid Fuel Heating2.3 mi
- Anglian Solar LtdElectrician2.3 mi
- Jack Byron Electrical LtdElectrician2.4 mi
Planning something similar?
See what the council approved and refused for new homes on your street. Pick your home and get the evidence before you pay for drawings.