Skip to content

Planning application P/2026/0642

Non-Material AmendmentApproved
Discharge / amendments

Approved on 20 November 2026

Proposal

Non material amendment for Plot H to introduce Building Height Amendment, Window Amendments, Facade Refinements, Loss of Green Roof, Improved Glazing Strategy, Plant Alterations and Enhanced Entrance Lobby following permission P/2023/3074 dated 16/06/2025 for the approval of reserved matters, including access, scale, appearance, layout and landscaping for Plot H submitted pursuant to outline planning permission 00607.BA.P2 dated 02.04.2015 for outline planning for the demolition of existing buildings and retention of a number of buildings as part of a comprehensive mixed use development comprising a maximum of 111,821sqm GEA including a maximum of 876 residential units along with associated works. The proposed development includes retail A1 use, residential C3 use, business B1 use and leisure D1.D2 use and associated uses as part of the development including car parking, cycle storage, and an energy centre. Creation of enhanced vehicular access and public realm works including hard and soft landscaping, works to the river walls and facilities associated with the mooring of boats, boat storage and maintenance. Full details are submitted for Phase 1 which includes erection of 323 residential units C3 use, retail A1 use and commercial units B1 use, an energy centre, car and cycle parking and associated works with creation of new vehicular and pedestrian access and circulation. Works to 129-130 High Street, works to and within Workhouse Dock including the provision of mooring facilities, a new pontoon access and associated facilities and other works incidental to the proposals including Environmental Impact Assessment

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Submitted
24 February 2026
  1. Received24 Feb
  2. Validated
  3. Consult.
  4. Target
  5. Decided20 Nov

Decided in 269 days (council typically 56)

About this application

This is a planning application for demolition. Hounslow has handled 88 applications of this type. This one was decided in 269 days, 30 weeks longer than Hounslow's typical decision time. In the past year there have been 86 applications across Syon & Brentford Lock.

87% of non-material amendment applications at London Borough of Hounslow were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Reference
P/2026/0642
Application type
Non-Material Amendment

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Flood zone 3: High probability (rivers and sea)Part of the site
  • Conservation area: Grand Union Canal & Boston ManorPart of the site · +1 more
  • Listed building: Grade II: 80, High StreetOn this site
  • Article 4 direction: Dwellinghouses (C3) to small HMOs (C4) - borough-wide Article 4 Direction+1 more
  • Heritage at Risk Register: Grand Union Canal and Boston Manor, BrentfordPart of the site
  • Brownfield land register: Land to the South Side of, Brentford High Street,Brentford,TW8 8EWRegister site at or near this address · +1 more

Possibly incomplete for this council: tree preservation orders.

Also checked, none recorded (18)

flood storage areas, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves and heritage coasts.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Hounslow

Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.