Skip to content

Hazelhurst Nursing Home Bishopswood Ross-On-Wye Herefordshire HR9 5QX

P260065/JWorks to trees covered by TPORefused

Refused on 26 June 2026

Council decision: Trees covered by TPO – Consent Refused6 reasons for refusal

Approximate site (title boundary)
Boundary © HM Land Registry, © Ordnance Survey · details

This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.

Proposal

Oak tree - undertake a crown reduction approx 30% to reduce its height/spread which is currently listing heavily towards the adjacent bungalow, in doing so it will reduce exposure to storm damage. Silver Birch - requires a third reduction of it crown as exposed to the wind in its elevated position above the bungalow. Needs to be managed to ensure that it doesn't become a risk to the property below. See application form and annotated photos for additional information.

Submitted
12 May 2026
  1. Received12 May
  2. Validated
  3. Consult.
  4. Target
  5. Decided26 Jun

Decided in 45 days (council typically 56)

About this application

This is a planning application at Hazelhurst Nursing Home Bishopswood Ross-On-Wye Herefordshire HR9 5QX. Herefordshire has handled 591 applications of this type. This one was decided in 45 days, 11 days quicker than Herefordshire's typical decision time. There has been 1 other application at this address. In the past year there have been 106 applications across Kerne Bridge. We hold 4,980 applications in total for the HR9 postcode area.

91% of works to trees covered by tpo applications at Herefordshire Council were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Why it was refused

  1. No evidence-based arboricultural justification has been provided to support the proposed canopy reductions to these two trees. At the time of the Tree Officer’s site visit, no structural, physiological, or biomechanical defects were identified that would warrant the proposed amenity-reducing works.
  2. The proposed canopy reductions would be detrimental to the trees’ natural shape, form, and canopy flow, resulting in a reduction in public amenity value.
  3. Unnecessary tree works should be avoided, as they increase the risk of damage to the tree’s vascular system and may facilitate the ingress of harmful pathogens or the activation of latent decay fungi.
  4. The proposed branch removals are likely to result in xylem dysfunction, leading to disruption of normal water transport and increased hydraulic stress. Such impacts may compromise tree health and structural integrity over time. On this basis, the proposed works are considered unacceptable.
  5. The trees are situated on a steep bank where they have adapted to this environmental condition during establishment. No indications of instability or weakness were observed at the time of the Tree Officer’s site visit.
  6. The trees overhang nearby residential properties and are beginning to encroach toward roof structures. However, this issue could be more appropriately addressed through selective canopy lifting, which would reduce the level of imposition while retaining canopy structure and amenity value, rather than through canopy reduction.

From the council's decision notice.

Application details

Postcode
HR9 5QX
Application type
Works to trees covered by TPO

Applicant and agent

Applicant
Private applicant

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations that overlap or adjoin the site outline.

  • Flood zone 3: High probability (rivers and sea)Part of the site
  • Listed building: Grade II: MilestoneOn or next to this site
  • National Landscape (AONB): Wye Valley

Not published by this council, so not checked: Article 4 directions and tree preservation orders. Ask the council if these matter.

Also checked, none recorded (20)

flood storage areas, conservation areas, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Herefordshire

Track this application

Get email alerts when there is a planning decision or status change.

Get email alerts near HR9

New planning applications delivered to your inbox daily.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.