Skip to content

E14 6QU

2025/1196All OtherAwaiting decision
Outline / PiP

Proposal

Notification from Tower Hamlets of application PA/24/00922 for 1 Phased site-wide demolition of all existing buildings and structures, site preparation and enabling works (including excavation); and 2 Phased construction of buildings comprising residential units (Use Class C3); flexible commercial business and service floorspace (Use Class E); hard and soft landscaping works including public open space, access and highway alterations, car and cycle parking provision, and all other associated ancillary works (the "detailed" element - Phase 1a); Outline Planning Permission (with all matters reserved) for: 3 Phased construction of buildings (including basements) comprising residential units (Use Class C3); flexible commercial; business and service floorspace (Use Class E); place of worship (Use Class F1); local community floorspace (Use Class F2); Public House (Sui Generis); hard and soft landscaping works including public open space, access and highway alterations, car and cycle parking provision, and all other associated ancillary works (the "outline element" - Phases 1b, 2, 3 and 4). This application is accompanied by an Environmental Impact Assessment. Summary of Proposals for the Purposes of Public Consultation but does not form part of the Description of Development A. Full planning application (Phase 1a): 475 x residential units (Use Class C3); 1,175 sqm (GEA) commercial space (Use Class E- parts a, b, c, d, e, & g). 148 sqm (GEA) workspace (Use Class E, g parts i, ii & iii) B. Outline planning application (Phases 1b, 2, 3 and 4): Up to 1,453 residential units (Use Class C3); Up to 1,126sqm sqm (GEA) commercial space (Use Class E parts a, b, c, d, e, & g)) Up to 1,932 sqm (GEA) workspace (Use Class E, g parts i, ii & iii) Up to1,688sqm (GEA) community centre/nursery Use Class F2/Class E (part f) Up to 1,133sqm (GEA) Mosque ? place of worship ( Use Class F1) Up to 374sqm (GEA) public house/commercial (Use Class sui generis/Class E) Amended Application: Minor change in description of development to remove construction of basements in Outline phases. Design Amendments to Phase 1a to include: Minor changes to the recess of patios on ground floor of Block B2; Redesign of the defensible space in front of the Block B2 maisonette; Change of materiality of Block B3 from red brick to buff brick; Identification of all accessible wheelchair units on proposed floorplans Additional information and clarifications regarding housing standards added to Phase1a floor plans. Design Amendments to Outline Phases (2-4) Amendments to the heights and massing of the following blocks within the Outline Element: i. Block B05 (increase from 24 storeys to 26 storeys), Block B12 (increase from 24 storeys to 26 storeys. ii. Block B12 from 24 storeys to 26 storeys. iii. Block B13 ? redesign of block to introduce varied massing of between 10 and 22 storeys (previously 18 storeys) and footprint reduced to maximise separation with neighbouring blocks. iv. Block B15 ? change to height of western most block from 16 storeys to 19 storeys. Associated redistribution of homes within these blocks (no change in overall unit numbers or affordable housing). Associated minor changes to non-residential floorspace. Amendments to Teviot Park Open Space (Phase 3) Increase in overall size by 456 sqm by consolidating space within Block 13 and increasing the efficiencies of servicing routes. Relocation of the 5-11 play space from Teviot Street into the open space. Refurbishment of the Fawe Street Bridge.

Submitted
21 May 2025
  1. Received21 May
  2. Validated
  3. Consult.
  4. Target
  5. Decided

About this application

This is a planning application for demolition at E14 6QU. Hackney has handled 186 applications of this type. It has been with the council since 21 May 2025 and is still awaiting a decision. There are no previous applications recorded at this address. In the past year there have been 7 applications across London Borough of Tower Hamlets (N). We hold 1,973 applications in total for the E14 postcode area.

77% of all other applications at London Borough of Hackney were approved. Across all application types, the council typically decides in about 8 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Highways & Access

Application details

Postcode
E14 6QU
Application type
All Other

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations at the address point. Ones next to the site may also apply.

  • Flood zone 1: Low probability (rivers and sea)

Not published by this council, so not checked: tree preservation orders. Ask the council if these matter.

Also checked, none recorded (23)

flood storage areas, conservation areas, listed buildings, Article 4 directions, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Source: Hackney

Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.

Track this application

Get email alerts when there is a planning decision or status change.

Get email alerts near E14

New planning applications delivered to your inbox daily.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused for new homes on your street. Pick your home and get the evidence before you pay for drawings.