29 Holywell Row, Hackney, London, EC2A 4JB
Approved on 24 November 2014
Council decision: GrantDelegated (officer decision)
Proposal
Erection of a second floor roof extension to 29 Holywell Row; erection of a three storey infill extension providing enclosed glazed staircase and associated soft landscaping of central courtyard and erection of a mansard roof extension to 30/30a Scrutton Street.
Boundary © HM Land Registry, © Ordnance Survey · details
This information is subject to Crown copyright and database rights 2026 and is reproduced with the permission of HM Land Registry. The polygons (including the associated geometry, namely x, y co-ordinates) are subject to Crown copyright and database rights 2026 Ordnance Survey AC0000851063. Conditions of use.
- Received
- 29 September 2014
- Decision level
- Delegated (officer decision)
- Council
- London Borough of Hackney
- Ward
- South
- ReceivedReceived29 Sep
- ValidatedValidated29 Sep
- Consult.Consultation29 Oct
- TargetTarget Date10 Nov
- DecidedDecided24 Nov
Decided in 56 days (council typically 56)
About this application
This is a full planning application for an extension at 29 Holywell Row, Hackney, London, EC2A 4JB. Hackney has handled 2,730 applications of this type. This one was decided in 56 days. The site is in the South Shoreditch conservation area. There have been 2 other applications at this address. We hold 1,207 applications in total for the EC2A postcode area.
85% of full applications at London Borough of Hackney were approved. Across all application types, the council typically decides in about 8 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Postcode
- EC2A 4JB
- Application type
- Full Planning Permission
- Development type
- Other - miscellaneous
- Scale / size
- Small
Planning application dates
- Date validated
- 29 September 2014
- Consultation expiry
- 29 October 2014
- Consultation start
- 3 October 2014
- Consultation end
- 29 October 2014
- Target decision date
- 10 November 2014
- Application expires
- 24 November 2014
- Permission expires
- 24 November 2017
Planning decision
- Statutory period
- 56 days
Publicity
- First advertised
- 20 October 2014
- Site notice start
- 20 October 2014
Additional information
- Documents
- 36
Site constraints
Designations that overlap or adjoin the site outline.
- Conservation area: South Shoreditch
- Article 4 direction: A4D Non-residential to residential+2 more
- Flood zone 1: Low probability (rivers and sea)
Not published by this council, so not checked: tree preservation orders. Ask the council if these matter.
Also checked, none recorded (21)
flood storage areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Planning history at this site
2 other applications at this property, newest first.
- 200318 Jun
Change use of 30 Scrutton Street to live work and combine with existing live work unit at 29 Hollywell Row…
ApprovedFull Planning Permission2003/1047 - 200118 Jan
Erection of 2nd floor roof extension with enclosed rear staircase from ground to 2nd floor level and internal…
ApprovedFull Planning Permission2001/0060
Source: Hackney
Contains public sector information from the Planning London Datahub, licensed under the Open Government Licence v3.0.
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near EC2A
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- Unit 2 30, 30 Scrutton Street, Hackney, London, EC2A 4HY2003/0215 · AmendmentRefused0.0 mi
- 24 Holywell Row, Hackney, London, EC2A 4JB2010/3200 · AmendmentApproved0.0 mi
- 26 Holywell Row, Hackney, London, EC2A 4JB2012/3043 · FullApproved0.0 mi
- 28 Scrutton Street, Hackney, London, EC2A 4RP2025/2805 · ConditionsApproved0.0 mi
- Site bounded by Worship Street, Curtain Road, Scrutton Street and Holywell EC2AP2025/0717/OBSApproved0.0 mi
For applicants and trades
Contractors near this project
Find contractors for extensions near this site- Inspire Spray CoatVerifiedLondonuPVC Window and Door SprayingGarage Door Spraying0.4 mi
- Orient Construction Consultancy LimitedVerifiedLondon1.7 mi
- Atlas South Technical Service LimitedVerifiedLondonProperty MaintenanceHandyman2.5 mi
- Avent Roofing ServicesVerifiedWestminsterRoofing2.7 mi
Planning something similar?
See what the council approved and refused for two-storey and first-floor extensions on your street. Pick your home and get the evidence before you pay for drawings.